That potential for the conduction of electricity through the system or structure is minimised
prior to, and during, any work activity;
That trailing work equipment, such as rope or lanyards, does not cause a hazard e.g. by
becoming entangled in other work equipment or restricting egress;
That climatic stress (e.g. extreme hot, cold or humidity) does not lead to impairment of
judgement, increase in risk levels and/or injury;
The use of appropriate PPE for the task which (as a minimum) ensures compliance with
local legislation e.g. head, ear, foot and eye protection;
That all safety warnings have been understood and acted upon;
That the climbing line is long enough for safe egress;
That there is a stopper of sufficient size and strength in the end of the rope to stop the
friction hitch running off the end of the rope.
That vigilance is maintained at all times.
rEsPONsibiliTiEs Of THE usEr
Summary of Contents for CEclimb
Page 1: ...CECLIMB HITCH CLIMBER SYSTEM COUNCIL DIRECTIVE...
Page 31: ...31 NOTES NOTES...
Page 61: ...61 NOTIZEN...
Page 62: ...62 ZERTIFIKAT...
Page 63: ...63 ZERTIFIKAT...
Page 64: ...64 ZERTIFIKAT...
Page 65: ...65 ZERTIFIKAT...
Page 66: ...66 ZERTIFIKAT...
Page 67: ...67 ZERTIFIKAT...
Page 97: ...97 ANOTACIONES ANOTACIONES...
Page 127: ...127 NOTES NOTES...
Page 157: ...157 COMMENTI COMMENTI...
Page 187: ...187 NOTITIES NOTITIES...