4) Install the second karabiner in the middle or top hole,
with the opening upward. Between the bite in the eye and
the constriction band, connect the eye termination of the
climbing line with the upper karabiner. Ensure the constric-
tion band on the eye termination is in close contact with
the load settling point of the karabiner. If necessary, spread
the legs of the eye termination to force the constriction
band into effective contact with the karabiner.
5) Before working at height, check that the grab function
of the friction hitch is reliable and that a controlled ascent
and descent is possible. Check that a small impact load is
effectively braked.
rEPlaCEmENT Of friCTiON HiTCH COrD (ValDôTaiN 4+4) aND sysTEm assEmbly
Summary of Contents for CEclimb
Page 1: ...CECLIMB HITCH CLIMBER SYSTEM COUNCIL DIRECTIVE...
Page 31: ...31 NOTES NOTES...
Page 61: ...61 NOTIZEN...
Page 62: ...62 ZERTIFIKAT...
Page 63: ...63 ZERTIFIKAT...
Page 64: ...64 ZERTIFIKAT...
Page 65: ...65 ZERTIFIKAT...
Page 66: ...66 ZERTIFIKAT...
Page 67: ...67 ZERTIFIKAT...
Page 97: ...97 ANOTACIONES ANOTACIONES...
Page 127: ...127 NOTES NOTES...
Page 157: ...157 COMMENTI COMMENTI...
Page 187: ...187 NOTITIES NOTITIES...