background image

24

CONNECTIONS FOR VARIOUS MODELS

GB

A6 - Connection for hose 3 (drainage).
N . B . :   H o s e s   1   a n d   2   f o r   t h e
decalcification system must always be
filled with water. Therefore, this
system must not be emptied during
installation.

CA - Electrical connection for the

IPX4 sauna (box with PG13.5
cable clamp ).

C

F

3

CA

P

N

A3

2

5

4

1

8

10

A4

D

4

A5

A6

D

3

3

A2

D

10

10

8

8

D

5

2

1

A1

9

Art. 122R (EASY)

- Easy Multifunction Shower Box with 2 Climates Steam Sauna

O n c e   t h e   p l u g s   ( D )   h a v e   b e e n
removed, they should not be used
again.

C - Hot water connection.

Use a 90 cm flexible stainless
steel hose.

F - Cold water connection.

Use a 90 cm flexible stainless
steel hose.

A1 - Connection for hoses 1 and 2 for

the sauna unit and for hose 5 for
the shower head with nebulizer.

A2 - Connection for hose 8 for the

vertical massage and for hose 10
for the back massage.

A3 - Cleaning of the taps with filter.

A4 - C o n n e c t i o n   b e t w e e n   t h e

electrical cable coming from the
dome and cable coming from the
power unit.

A5 - Connection for hose 4 (boiler).

Blue
Yellow-Green
Brown

Summary of Contents for 122R

Page 1: ...jets 2 Foot jets 9 16 Capacity l min 2 5 bar Pressure Min Max Pressure Min Max Supply 1 1 2 Drain Conn HYDRAULIC CHARACTERISTICS ELECTRICAL CHARACTERISTICS 1 Multifunctions Sauna 18 1 Before connecti...

Page 2: ...ON THE LEFT 1 2 POSITIONING THE SHOWER BASE Place the bathtub in the corner of the bathroom and make sure it is on a level by using the appropriate adjustable feet Prepare the drain connection using t...

Page 3: ...back shower panel and into the shower base without tightening them 3 3a ASSEMBLING THE BACK PANELS Place drain cover on the drain in the shower base Move the shower base away from the corner in order...

Page 4: ...1 so that they match up with the holes on the back panel B if necessary use a 2 5 Allen wrench Check that the seal fits properly along the entire length of the side panel B1 support Fasten the side pa...

Page 5: ...between the back panel and the bathtub 5 6 INSTALLING THE TOP TRACK Remove the screws from the ends of the top track Insert the track onto the ends of the supports and fasten it to the back panels usi...

Page 6: ...he lower track Lift the door up so that the top wheels N slide into the track MOUNTING THE TWO CLIMATE SAUNA DOME UNTO THE SHOWER CABIN Place the adhesive steam seal onto the top edge of the back pane...

Page 7: ...with 2 Climates Steam Sauna Once the plugs D have been removed they should not be used again C Hot water connection Use a 90 cm flexible stainless steel hose F Cold water connection Use a 90 cm flexi...

Page 8: ...H SEAT 3 4 2 1 7 8 6 5 4 2 3 10 EQUIPOTENTIAL EARTHING CONNECTION Connect the metal parts of the ca bin with the yellow wire as indica ted in the diagram There is a terminal at point 7 for the equipot...

Page 9: ...2 USING THE SHOWER FOR THE FIRST TIME Once all of the connections are made and before fastening the ca bin to the wall remove all of the adhesive tags Run the regeneration and a sauna cycle following...

Page 10: ...the frame drill a hole in the wall insert the screw with the fischer and fasten the bracket T1 to the frame tightening the screw with the washer C1 Remove the spacer and center the dome on the shower...

Reviews: