5 First steps
32
5
First steps
5.1.
Commissioning
Control Unit
The Control Unit has a permanently installed rechargeable battery.
> Remove the protective film from the display.
> Charge the rech. batt. fully before using the Control Unit.
Meas. box
The meas. box is supplied with a rech. batt. already fitted.
> Charge the rech. batt. fully before using the meas. box.
5.2.
Getting to know the product
5.2.1.
Mains unit, batteries/rechargeable batteries
In case of longer interruption of the power supply to the
Control Unit (e.g. rech. batt. empty) the settings for date /
time will be lost.
5.2.1.1.
Recharging the rech. batt. of the Control Unit
The rech. batt. can only be charged at an ambient temperature of
±0...+35°C. If the rech. batt. had been completely discharged, the
charging time at room temperature will take about 7h (charging with
mains adapter) or approx. 14h (charging via Testo Data bus).
In the case of Testo data bus cables >90 m, the
rechargeable battery for the control unit can no
longer be charged via the Testo data bus cables
when the control unit is switched off. In this case
the external mains unit 0554 1096 is required in
order to charge the battery.
The CU can be used without an external mains unit during
operation, even with Testo data bus cables >90 m.
testo data bus cables must not be used during electrical
storms.
Summary of Contents for 350 Maritime V2
Page 1: ...testo 350 Flue gas analyzer Instruction manual...
Page 2: ...2...
Page 106: ...0970 3511 en 05_GB...