28. Glossary
Nominaltemperature:
Nominaloperation:
Nominaloperation time:
Safetemperature:
Safeoperation:
Desired temperature during the adjusted heat times (usually during the daily),
standard attitude = 20°C..
The respective heating circuit is operated in such a way that in the appropriate areas the
nominal temperature (computational) adjusts itself.
That time, in which the nominal temperature for the heating is valid
(standard: 6:00 till 22:00h )
Desired room temperature out of the desired heating times (normally during the night),
standard attitude = 16°C
The respective heating circuit is operated in such a way that in the appropriate areas the
nominal temperature (computational) adjusts itself.
That time, in which the save-temperature for the heating is valid. Can be adjusted not
directly, but arises as a result of the attitude of the nominal operation time.
In the heating program the nominal operating times are adjusted ,then also the
saving periods of operation are specified defined. The heating program can be stopped
for each heating circle separately.
equal with nominaloperat time
Desired temperature for the adjusted heating circuit, indipendend from the temperature
outdoor, from heatprogram and from Summer-Winter-change.
Coleration between the outdoor temperature and the flow temperature from heating.
Individual attitude of the heat curve, a higher attitude causes higher flow temperatures.
The temperature, the respective heat circuit is provided. Indipendedend from the function
of the heat circuit(norm-, safe operation), from outdoor temperature, from the caracteristic
curve and from the room influence.
The acutal room temperature will be considered for the calculation of the flowtemperaure from
the heating circuit
- room to warm: flowtemperature decrease
- room to cold: flowtemperature increase
A higher attitude, sets a stronger reaction of the control onto the room temperature
Times ,when the buffer will be loaded.
In this desired time the buffer will be loaded if necessary, out of this time it is not possible to
charge the buffer.
Some power suppliers block the main currency at different times. In this times the heat pump
won´t operate. The times can be set, that the control reacts in the right way.
Safeoperation time:
Heat program:
Heat time:
Constanttemperature:
Caracteristic curve:
Curve steepness:
flow temperature:
Room influence:
Room influence -quota:
Buffer loading program:
Buffer loading time:
Power blocking times:
Page 28