Installation and Operating Guide
Smart Pass-Through Chambers
©
Copyright 2017 Terra Universal Inc. All rights reserved. • Revised July 2020 • Document No. 1788-27
Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020
16
Appendix: Installation Qualification Checklist
5.0
To confirm proper installation, fill out the checklist below for each pass-through installed. Note any suspected damage, deviations
from installation procedures, or performance issues in the Comments section. Equipment is found to be acceptable only when all
installation criteria have been accepted and the document signed by the relevant parties.
Installation Checklist
Verify the following:
Check if
Confirmed and
Accepted
Performed by / Date
All mounting brackets are secured tightly
against the wall
Support brackets (if provided) have been
installed below the pass-through
No gaps larger than 1/16” exist between
the pass-through and the wall/floor surface
Pass-through doors open smoothly and
close completely, with the latch centered in
the corresponding catch
The seal/gasket on the inside of each door
is intact, fully adhered to the door, and
seats tightly against the face of the pass-
through without visible gaps
The interlock functions properly,
preventing the door from opening when
the opposite door is also open
The interior of the pass-through is clean
and clear of any debris from installation
Floor ramps (if provided) have been
positioned at the base of the pass-through
Performed by: _________________________________ Date: _________________
Reviewed by: _________________________________ Date: _________________
Comments: