Installation and Operating Guide
Smart Pass-Through Chambers
©
Copyright 2017 Terra Universal Inc. All rights reserved. • Revised July 2020 • Document No. 1788-27
Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020
5
Installation
2.0
2.1
Wall Cut-Out
1.
The CleanMount® System (featured on select pass-throughs) utilizes a
clamping mechanism to allow the pass-through to be installed without
any fasteners piercing the wall surface. This design enables quick
installation with minimal impact on any high-grade finished surfaces, and
a significant reduction in debris and airborne particulates. When making
the wall cut-out for this type of pass-through, installers now have the
option of finishing and sealing the cut-out with a cleanroom-grade
surface. That way, if the pass-through must be removed at a later date,
the CleanMount® System will disassemble quickly and cleanly while the
cleanroom can remain in operation.
2.
Make a wall cut-out of the size specified in the table below.
Mounting Bracket Style
Wall Cut-Out Dimensions
CleanMount®
Add 3” to the width and 1” to
the height of the outside of the
chamber
3.
Add framing to the inside of the wall cut-out using a rigid support
material, such as wood or metal.
4.
Finish the wall cut-out with an appropriate substrate and finishing
material. As a general rule, the wall cut-out should have the same grade
of finishing as the wall it is installed in (e.g. cleanroom-grade materials).
Figure 4
Pass-through with CleanMount® Mounting
Bracket