![Terex RT200-1 Operator'S Manual Download Page 149](http://html1.mh-extra.com/html/terex/rt200-1/rt200-1_operators-manual_1088794149.webp)
Wheel Removal & Installation Procedure
TOOLS REQUIRED FOR PROCEDURE
1. Fork Lift Truck- Rated to pick 1700 lbs.
(772 Kg)
4. Air Impact Wrench-3/4" drive or Breaker
Bar
2. Socket-1 1/2" deep well.
5. Torque Wrench-500 ft lb (678 NM) rating.
3. Extension-12"
CRANE MODEL
TIRE SIZE
WHEEL ASSEMBLY WEIGHT
RT200-1
20.5 X 25
1300 LBS (590 Kg)
To properly remove or install a wheel & tire assembly, the use of a forklift is required due to
the weight of tire & rim.
Wheel installation and removal can be dangerous and must be done only by
trained personnel using the proper tools and procedures. Failure to read and
comply with all procedures may result in serious injury or death to you or others.
Wheel Assembly Removal
1.
Set outriggers and level the crane, but do not lift tires from ground.
2.
Starting with removal on one wheel assembly at a time, loosen lug nuts on one wheel,
but do not remove the lug nuts.
3.
Run fork lift tongs under tire as shown in photo to support wheel assembly.
4.
Remove the lug nuts using air impact wrench (or breaker bar) and 1 1/2" deep well
socket with 12" extension. If difficult to remove slightly raise the front or rear
outriggers to slightly raise the tire off the ground.
5.
Back out the forklift with the wheel assembly.
6.
Shore up the axle in preparation for maintenance work on wheel hub.
Wheel Assembly Installation
1.
Set outriggers and level the crane to a height that will allow a couple of inches
clearance between bottom of tire and ground level.
2.
Remove any blocking under the axle if utilized.
3.
With forklift tongs under the tire as shown in photo to support wheel assembly and
move to crane axle hub.
4.
Slowly position bolt circle on wheel assembly to studs on axle hub.
5.
Start lug nuts onto studs and adjust forklift up / down tongs to allow wheel assembly
to get perpendicular to axle.
6.
Tighten lug nuts using air impact wrench (or breaker bar) and 1 1/2" deep well socket
with 12" extension.
7.
Torque lug nuts with torque wrench to 450-500 Ft / Lbs (610-678 NM).
Maintenance
148
P/N 12261-319 REVISED: August 2012
Summary of Contents for RT200-1
Page 1: ...Courtesy of Crane Market...
Page 5: ...Courtesy of Crane Market...
Page 13: ...Courtesy of Crane Market...
Page 47: ...Safety 46 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Page 79: ...Courtesy of Crane Market...
Page 87: ...Courtesy of Crane Market...
Page 124: ...Lubrication Chart Maintenance 123 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Page 150: ...149 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Page 152: ...151 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Page 174: ...173 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Page 195: ...Courtesy of Crane Market...
Page 197: ...Courtesy of Crane Market...
Page 208: ...207 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Page 211: ...Notes Courtesy of Crane Market...