Figure 9-17
11.
Disconnect the tubes from the side of the loader
valve. Cap and plug all openings to prevent fluid
loss.
Figure 9-18
12.
Disconnect the hoses from the rear and side of the
loader valve. Cap and plug all openings to prevent
fluid loss.
Figure 9-19
13.
Remove the nuts securing the valve to the reser
voir as shown.
Figure 9-20
14.
Remove the valve from the machine.
15.
Installation is the reverse of the removal proce-
dure.
16.
Once all components have been reinstalled and
are secure, add manufacturer approved hydraulic
fluid until full mark is reached on the level gauge.
Note:
To eliminate trapped air from the system, acti-
vate all hydralic circuits and run machine through its
paces including moving the lift arms up and down, curl-
ing and tilting the Q/A, driving forward and in reverse,
and activating the auxiliary circuit. Then, check
hydraulic fluid level and add as required to reach full
mark.
9-6
Compact Track Loader
9. Loader/Transmission Controls
Summary of Contents for PT-30
Page 1: ...PT 30 Part Number 2010 513 Printed 1 11 Service Manual Compact Track Loader ...
Page 2: ......
Page 3: ......
Page 7: ......
Page 13: ...1 6 ...
Page 15: ......
Page 19: ......
Page 35: ......
Page 51: ......
Page 65: ......
Page 73: ......
Page 85: ......
Page 99: ......
Page 103: ......
Page 115: ......