4. Disconnect the cables from the on-board battery
charger.
5. Remove the hardware securing the top of the on-
board battery charger to the machine.
6. Carefully lower the on-board battery charger from
the machine.
7. Reinstall the on-board battery / install the new
onboard battery in reverse order of disassembly.
NOTE: The on-board charger can be programmed for
multiple battery confi gurations. This confi guration data
is stored in the interface module and will automatically
confi gure a replacement battery charger once installed
and following a power-up cycle. Reprogramming is
required if the interface module has been replaced, or
if a different type of battery is used (other than factory-
installed equipment). (See SERVICE DIAGNOSTICS
TOOL section in this manual)
Models equipped with the PRO-Panel LCD Touch
Panel can be confi gured through the touch panel. All
other models must be confi gured through separate
confi guration software via a mini-USB programming
port on the back of the operator console. (See
SERVICE DIAGNOSTICS TOOL)
Summary of Contents for T600e
Page 13: ...T600 T600e 9016605 04 2018 13 GENERAL INFORMATION T600 ELECTRICAL SCHEMATIC PAGE 1 1 2 3 5 4...
Page 14: ...14 T600 T600e 9016605 04 2018 GENERAL INFORMATION T600 ELECTRICAL SCHEMATIC PAGE 2 1 2 3 5 4...
Page 15: ...T600 T600e 9016605 04 2018 15 GENERAL INFORMATION T600 ELECTRICAL SCHEMATIC PAGE 3 1 3 2...
Page 16: ...16 T600 T600e 9016605 04 2018 GENERAL INFORMATION T600 ELECTRICAL SCHEMATIC PAGE 4 1 2 3...
Page 17: ...T600 T600e 9016605 04 2018 17 GENERAL INFORMATION T600e ELECTRICAL SCHEMATIC PAGE 1 1 2 3 5 4...
Page 18: ...18 T600 T600e 9016605 04 2018 GENERAL INFORMATION T600e ELECTRICAL SCHEMATIC PAGE 2 1 2 3 5 4...
Page 19: ...T600 T600e 9016605 04 2018 19 GENERAL INFORMATION T600e ELECTRICAL SCHEMATIC PAGE 3 1 2...
Page 20: ...20 T600 T600e 9016605 04 2018 GENERAL INFORMATION T600e ELECTRICAL SCHEMATIC PAGE 4 1 2...