28
www.templari.com
9.3 Supply
Connect the supply of the machine to the internal terminal block
according to the scheme shown below. The cable routing occurs
throught the special holes as shown in the previous schemes.
APPROXIMATE section of cables and internal protection:
Electrical details
MODEL
Po
w
er supply
Po
w
er a
t
A-20 /W55
COP a
t A
-20/W55
Electric
al
consump
tion
A-20/W55
(kW)
INVER
TER
(A)
Thermal br
ak
er
magne
tic
swit
ch
Electric
al
diff
er
en
tial
swit
ch
(mA)
Cable
section:
2mm
(f
or
a
line
with
a t
ot
al lengh
t
up
to
5
me
ter
s)
KITA Si
230V/1ph
5,58
1,99
2,80
18
16A
30mA
3x2,5
KITA Si Plus
6,31
1,75
3,60
18
20A
30mA
3x4
KITA Si Cold
9,10
1,77
5,14
18
30A
30mA
3x4
KITA Si Plus Cold
10,70
1,50
7,10
18
40A
30mA
3x4
KITA Mi
7,80
1,69
4,60
18
25A
30mA
3x4
KITA Mi Cold
11,80
1,47
8,00
18
40A
30mA
3x4
KITA Mi Plus
11,00
1,59
6,90
18
35A
30mA
3x4
KITA Mi Plus Cold
16,70
1,89
8,84
18
50A
30mA
3x4
KITA Si
400V/3ph
5,58
1,99
2,80
18
16A
30mA
5x2,5
KITA Si Plus
6,31
1,75
3,60
18
16A
30mA
5x4
KITA Si Cold
9,10
1,77
5,14
18
16A
30mA
5x4
KITA Si Plus Cold
10,70
1,50
7,10
18
16A
30mA
5x4
KITA Mi
7,80
1,69
4,60
18
20A
30mA
5x4
KITA Mi Cold
11,80
1,47
8,00
18
20A
30mA
5x4
KITA Mi Plus
11,00
1,59
6,90
18
20A
30mA
5x4
KITA Mi Plus Cold
16,70
1,89
8,84
18
20A
30mA
5x4
KITA L33
400V/3ph
23,10
2,37
9,75
18
20A
30mA
5x4
KITA L42
28,80
2,69
10,71
24
32A
30mA
5x6
KITA L66
18,30
1,46
12,50
24
32A
30mA
5x6
KITA L Cold
29,70
1,48
20,00
35
40A
30mA
5x6
KITA Li Plus
33,20
1,65
20,12
40
40A
30mA
5x6
WARNINGS!
The cable section of supply has to be considered approximate
and relevant to the last section of the line towards the machine
that has to be as short as possible. The external protections, the
laying and the section of the cables of the supply line mentioned
have to be dimensioned and made by an authorized staff and
according to technical standards of the relevant national rules.
9.4 Probes and remote panel
Temperature probes B2 (heating/cooling) and B3 (Domestic)
have to be connected with a multicore cable 1,5 mmq shielded
following the shortest route and far from power cables. Particular
attention has to be paid in junctions dato since possible parasitic
resistances affect the control card readings. The remote panel
cable (6 wires ethernet cable) can be laid together the probes
cable with the same precautions.
WARNINGS!
We suggest to use a ferrite toroid to protect the remote panel
from possible external disturbances.
In the case of a flowmeter (KITA Energy) is present consult the
wiring diagrams in the paragraphs 10.5, 10.6, 10.7 (B5 = clamp
37).
Summary of Contents for KITA L Cold
Page 1: ...AIR WATER version Installation and maintenance manual T H E H E A T P U M P...
Page 5: ......
Page 65: ...65 www templari com...
Page 66: ...66 www templari com...
Page 67: ...67 www templari com...