![Templari KITA ACQUA Installation And Maintenance Manual Download Page 38](http://html1.mh-extra.com/html/templari/kita-acqua/kita-acqua_installation-and-maintenance-manual_1085665038.webp)
38
www.templari.com
12 Control terminal
The terminal of the unit is connected serially through line P-LAN
and can be installed on board or in remote (technical room or
house) to control the unit. In the control software have been
implemented all the settings necessary to grant the functionality
and the safety of the machine, and by the terminal you can
monitor the operation of the unit and set the parameters of
operation preference (summer/winter setpoint...). Here below
some example picture will be shown to use the control and the
start up of the machine.
12.1 Fixing of the panel
The panel can be fixed:
•
directly on the wall through the screws and the fischer
supplied with the kit (optional version supplied on
demand).
To fix the panel proceed as shown:
•
fix the back box (A) to the standard box or to the wall (Fig.
2);
•
connect the phone cable to the panel;
•
fix the front (B) to the back box (A) by the screws supplied
with the kit;
•
instal the snapframe (C).
(Fig. 2)
12.2 Unit control measures
156
18
30
125
67
82