INSTALLER TO COMPLETE
COMMISSIONING CHECK LIST
Site Name/address: ..........................................................................................................................................................................
Installing Company ...................................................................................................... Date: ..........................................................
Serviceman: ............................................................................................................... Tel: ............................................................
Model ..................................................................... Serial No..................................... Site Ref. ....................................................
Unit mounted level?
Y / N
Supply voltage checked?
Y / N
Temperzone recommended drain trap fitted?
Y / N
External electrical isolator fitted?
Y / N
Water drains tested okay?
(panels on, fan running)
Y / N
Indoor Plug fan set voltage
V
Does unit have adequate safe access?
Y / N
Are temperature controller’s parameters set?
Y / N
All electrical terminals are tight?
Y / N
Checked for excessive noise & vibration of unit?
Y / N
Return air filters fitted?
Y / N
Has client had controls demo?
Y / N
Removed compressor shipping blocks?
Y / N
Electrical Certificate Of Compliance issued?
Y / N
Refrigeration leak checked?
Y / N
Fresh air damper setting (if applicable)
%
Is air flow set and balanced?
Y / N
Thermostat type:
BMS / SAT-3 / TZT-100 / Other? (name):
Mark UC8 dip switch positions with an 'X'
SW1
SW2
1
2
3
4
5
6
7
8
9 (1) 10 (2) 11 (3) 12 (4) 13 (5) 14 (6) 15 (7) 16 (8)
On
On
Off
Off
Record the following UC8 monitored conditions using push button SW3 (repeat to scroll through list).
IMPORTANT: Digital compressors must be operating at 100% for at least 10 minutes when taking these readings.
System 1
Cool Cycle:
Low Pressure:
SLP
kPa
Outdoor Ambient temperature:
°C
Evap temperature:
Et
°C
Indoor Return air temperature:
°C
Suction Line temperature:
SLt
°C
Indoor Supply air temperature:
°C
Suction Superheat:
SSH
K
Indoor fan amps :
A
Discharge Line Pressure:
dLP
kPa
Fresh Air introduced :
%
Condensing temperature:
Ct
°C
Compressor 1 amps :
A
Discharge Line temperature:
dLt
°C
Compressor 2 amps :
A
Discharge Superheat:
dSH
K
De-ice Sensor temperature:
ICEt
°C
Required Capacity:
CAP
%
Expansion Valve 1:
EE1
%
Expansion Valve 2:
EE2
%
Heat Cycle:
Low Pressure:
SLP
kPa
Outdoor Ambient temperature:
°C
Evaporating temperature:
Et
°C
Indoor Return air temperature:
°C
Suction Line temperature:
SLt
°C
Indoor Supply air temperature:
°C
Suction Superheat:
SSH
K
Indoor fan amps :
A
Discharge Line Pressure:
dLP
kPa
Fresh Air introduced :
%
Condensing temperature:
Ct
°C
Compressor 1 amps :
A
Discharge Line temperature:
dLt
°C
Compressor 2 amps :
A
Discharge Superheat:
dSH
K
De-ice Sensor temperature:
ICEt
°C
Required Capacity:
CAP
%
Expansion Valve 1:
EE1
%
Expansion Valve 2:
EE2
%
NOTE: This document to be kept with the unit. Failure to provide this completed page on request by Temperzone may affect unit
warranty.