SyriXus Series Pumps Installation and Operation Guide
Section 1 Introduction
1-18
EAR99 Technology Subject to Restrictions Contained on the Cover Page
1.6 Preliminary
Checkout
After the electrical connections have been completed, follow this brief
test of the pump’s operation:
NOTE
Preliminary checkout of the pump is performed without fluid in the
pump.
If adding a new pump to the controller, a hard and soft reset need to
be completed. Refer to Section 9.5 "Resetting the System".
Caution
Always maintain clearance behind the pump such that the M
AINS
power cord can be unplugged at any time.
1. Before connecting the line cord, make sure the voltage rating on
the serial tag matches your outlet’s voltage. Plug in the line cord.
Turn the pump power switch ON. Turn the controller
ON/STANDBY switch ON.
2. The display will briefly show the software revision on the first
line and the pump model(s) connected to the controller.
Figure 1-10 Status Screen
3. Check the upper left corner of the controller screen. The current
pump mode will appear in a two-letter abbreviation,
e.g.
CF for
Constant Flow. This will be followed by a lowercase letter indi-
cating the current pump,
e.g
. “a” indicates that pump A is the
current pump. The current pump is the one for which parame-
ters are being shown.
• If a pump other than pump A is currently selected:
In the lower right corner of the screen, directly over softkey
D, are the words “SELECT PUMP.”
Press
MENU
> 2 > A
to select pump A. The display will
automatically switch to the run screen, showing “a” in the
upper left corner.
PUMP CONTROLLER ISCO, INC. REV ____
<PUMP MODEL>
SERIAL CHANNEL X, UNIT ID 6, Baud = 9600
CD Jun 16, 2011