TAI - Thermal Converter Operator Manual - Page 2
1.1 Claims for damaged shipments
All instruments should be thoroughly inspected immediately upon receipt. Material in the container
should be checked against the enclosed packing list. If the contents are damaged and/or the instrument
fails to operate properly, the carrier and TAI should be notified immediately.
The following documents are necessary to support claims:
•
Original freight bill and bill of lading
•
Original invoices or photocopy of original invoice
•
Copy of the packing list
•
Photographs of damaged equipment and container
1.2 Claims for shipping discrepancies
All containers should be checked against packing list immediately upon receipt. If a shortage occurs,
notify the carrier and TAI immediately. TAI will not be responsible for shortages against the packing list
unless they are reported immediately.
The following information is necessary to make a claim:
•
The instrument model number
•
Serial number
•
Sales order number or purchase order number
Upon receipt of a claim, TAI will advise disposition of the equipment for repair or replacement.
Summary of Contents for 6200A
Page 9: ...TAI Thermal Converter Operator Manual Page 5 FIGURE 2 1 BASIC CONFIGURATION ...
Page 10: ...TAI Thermal Converter Operator Manual Page 6 FIGURE 2 2 WITH IZS OPTION ...
Page 11: ...TAI Thermal Converter Operator Manual Page 7 FIGURE 2 3 WITH M702 CALIBRATOR OPTION ...
Page 13: ...TAI Thermal Converter Operator Manual Page 9 FIGURE 2 4 TRS CONVERTER LAYOUT ...
Page 15: ...TAI Thermal Converter Operator Manual Page 11 FIGURE 2 5 PNEUMATIC CONNECTIONS ...
Page 22: ...TAI Thermal Converter Operator Manual Page 18 FIGURE 3 1 TRS WIRING DIAGRAM ...
Page 25: ...TAI Thermal Converter Operator Manual Page 21 FIGURE 4 1 DILUTER FLOW BLOCK ASSEMBLY ...
Page 27: ......
Page 35: ......
Page 41: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 2 2 Rear Panel 2 4 ...
Page 47: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 2 4 Front Panel 2 10 ...
Page 48: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 2 5 Assembly Layout 2 11 ...
Page 51: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G INTENTIONALLY BLANK 2 14 ...
Page 65: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 5 2 Setup Menu Tree 5 2 ...
Page 107: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G INTENTIONALLY BLANK 6 26 ...
Page 140: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 8 2 Reaction Cell 8 7 ...
Page 141: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 8 3 Pneumatic Diagram 8 8 ...
Page 193: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 9 6 Flow Pressure Sensor 9 50 ...
Page 194: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 9 7 SO2 Sensor Module 9 51 ...
Page 195: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 9 8 SO2 Sensor Module 9 52 ...
Page 198: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 9 9 PMT Cooler Subsystem 9 55 ...
Page 204: ...TAI Model 6200A SO2 Analyzer Operator Manual 02164 Rev G Figure 9 11 Kicker Leak Check 9 61 ...