
© Telect, Inc., All Rights Reserved, 132152-12 A0
1.509.926.6000 :: telect.com
5
100A/60A Universal Voltage GMT Fuse Panels
With Enhanced Power/Fuse & Bay Alarms
Power
:: HPGMTXX & GMTXX
1.3 Important Installation Guidelines
• Elevated Operating Ambient
- If you install the rack in a closed or multi-unit rack assembly, the operating
ambient temperature of the rack environment may be greater than room ambient. Therefore, take care to install
the equipment in an environment compatible with the maximum ambient temperature (TMA) specified by the
manufacturer.
• Reduced Air Flow
- Installation of the equipment in a rack should be such that the amount of air flow required
for safe operation of the equipment is not compromised.
• Mechanical Loading
- Mounting of the equipment in the rack should be such that a hazardous condition is
not achieved due to uneven mechanical loading.
• Circuit Overloading
- Give consideration to the connection of the equipment to the supply circuit and the ef-
fect that overloading of the circuits might have on overcurrent protection and supply wiring. Use appropriate
consideration for equipment nameplate ratings when addressing this concern.
• Reliable Earthing
- Maintain reliable earthing of rack-mounted equipment. Pay particular attention to supply
connections other than direct connections to the branch circuit (e.g., use of power strips).
• Disconnect Device
- Incorporate a readily accessible disconnect device in the building installation wiring.
1.4 Inspection
Please read and understand all instructions before starting installation. If you have questions, contact Telect
Technical Support at [email protected] or call 1.509.926.6000.
When you receive the equipment, carefully unpack it and compare it to the packaging list. Please report any
defective or missing parts to Telect Quality at [email protected] or call 1.509.926.6000.
Telect is not liable for trasit damaged. If the product is damaged, please report it to the carrier and contact
Telect Quality.