INSTALLATION
2.1 INTRODUCTION
The procedure, listed below, must be followed when installing the systems.
Using the Sales Form, the necessary equipment must be ordered.
2. Mount components, Main Equipment, SDF, Power Supply, Stations, Powerfail Bell, Ring
Generator Unit,
and Call Metering Unit.
3. Cable the site.
4. Terminate cables at M.E., SDF, 610 Sockets, Powerfail Bell, Ring Generator Unit, RTIU,
Call Metering Unit, External Music Source, External Paging Loudspeakers and Alarm
Detector.
Lightning protection must be provided.
A Telecom earth must be terminated on the Call Metering Unit.
5. Plug boards into Main Equipment.
6. Power-up the system.
7. Check cabling by measuring voltages at 610 sockets.
8. Connect Handsfree Consoles to the associated stations. Plug-in stations.
9. Programme the system using information provided on the sales form.
10. Carry out the functional test to ensure the system is operating correctly.
11. Write-up the site records.
Details required to perform the above procedure are described in this section.