PRELIMINARY CHECKS AND
 INSTALLATION OF BASE
PLATE IN THE GROUND

VORBEREITENDE
ÜBERPRÜFUNGEN UND
ERDUNG DER GEGENPLATTE

CONTROLES VOORAF
EN DE MONTAGEPLAAT
OP DE GROND INSTALLEREN

Before installing, it is advisable to check that
the ground where the barrier is to be installed
is solid and suitable so that correct operation
is not compromised.
If the RAP-3 rests on a solid cement base, it
may fixed directly to the ground with 4 screw
anchors dia.12 (fig. 2) otherwise fixing may be
done using the plate provided together with 8
nuts, 8 washers dia. 12 and 4 rag bolts (fig. 3).
In this case, proceed as follows:
1. Dig a foundation hole, according to the

measurements of the foundation plate.

2. Place ducts in the hole for the supply and

external connection cables to pass through.

3. Assemble the plate-rag bolts (fig. 3).
4. Bury the ducts and foundation plate in the

cement and check that they are horizontal.

5. Unscrew the nuts from the 4 rag bolts after

the cement has set.

6. Position the RAP-3 on the plate, fixing it with

the 4 washers and 4 nuts provided.

Vor der eigentlichen Installation ist es ratsam
zu überprüfen, ob der Installationssitz der
Schranke solide und geeignet ist, und einen
korrekten Betrieb ermöglicht.
Wenn die RAP-3 auf einer soliden Grundlage
aus Zement aufliegt, kann eine Schwelle mit 4
Spreizdübeln Ø 12 (abb. 2) direkt befestigt
werden, bzw. kann die Befestigung mit Hilfe
der Platte erfolgen, die zusammen mit 8
Muttern, 8 Unterlegscheiben Ø 12 und 4
Ankern geliefert wird (abb. 3). In diesem Fall
ist wie folgt zu verfahren:
1. Einen Aushub entsprechend den Abmes-

sungen der Fundamentsplatte durchführen.

2. Die Versorgungsschienen der Zufuhrkabel

und der externen Anschlüsse in dem Aushub
verlegen.

3. Die Montage Platte-Anker (abb. 3)

durchführen.

4. Die Schienen und die Fundamentsplatte in

dem Zement verlegen und deren horizontale
Ausrichtung überprüfen.

5. Die Muttern der 4 Anker festschrauben,

nachdem der Zement fest geworden ist.

6. Die RAP-3 auf der Platte positionieren und

unter Zuhilfenahme der 4 mitgelieferten
Unterlegscheiben und der 4 Muttern
befestigen.

Alvorens tot de eigenlijke installatie over te
gaan adviseren wij u te controleren of de plaats
waar de slagboom geïnstalleerd wordt solide
en geschikt is zodat de slagboom goed kan
functioneren.
Als de RAP-3 op een solide betonnen
fundering steunt, dan kan de slagboom met 4
expansiepluggen met een diameter van 12 mm
(fig. 2) rechtstreeks aan de grond bevestigd
worden of de slagboom kan met behulp van
de plaat bevestigd worden die met 8 moeren,
4 onderlegringen met een diameter van 12 mm
en 4 ankers (fig. 3) bij de levering van de
slagboom inbegrepen is. In dat geval moet u
als volgt te werk gaan:
1. Graaf een funderingsgeul waarbij u rekening

moet houden met de afmetingen van de
funderingsplaat.

2. Leg de kabelgoten voor de voedingskabels

en de leidingen voor de externe
aansluitpunten in de geul.

3. Monteer de plaat met de ankers (fig. 3).
4. Controleer of de kabelgoten en de

funderingsplaat volledig horizontaal liggen
en dek ze vervolgens met beton af.

5. Draai nadat het beton uitgehard is de

moeren van de 4 ankers af.

6. Zet de RAP-3 op de plaat en maak deze

met de 4 meegeleverde onderlegringen en
de 4 moeren vast.

Fig. 2 / Abb. 2

Fig. 3 / Abb. 3

7

GB

D

Nl

Summary of Contents for RAP-3

Page 1: ...CE S ADRESSE DES TECHNICIENS SP CIALIS S DANS L INSTALLATION BARRERA ELECTROMEC NICA MANUAL INSTRUCCIONES Y CATALOGO REPUESTOS EL PRESENTE FOLLETO EST DESTINADO AL PERSONAL T CNICO ESPECIALIZADO EN IN...

Page 2: ...per asta RAP 3 is an electromechanical barrier designed for use at entrances to car parks multi storey parks factories public administration buildings hospitals apartment blocks etc It consists of a b...

Page 3: ...Intermitencia trabajo Longitud m x asta Peso Line voltage Motor power supply Max input current Max input power Nominal torque Opening time Movement Max angle of rotation Operating temperature Motor g...

Page 4: ...nte 9 Antena 10 Interruptor diferencial 11 Interruptor general 12 L nea de alimentaci n 1 Fotocellen 2 Vaste steun 3 Aluminium slagboom 4 Ruitvormige reflectoren 5 Sleutelschakelaar 6 Afrasteringscons...

Page 5: ...QUADRO D ASSIEME TABLEAU D ENSEMBLE CUADRO DEL CONJUNTO GENERAL ASSEMBLY GESAMTANSICHT OVERZICHTSTEKENING I F E GB D NL Fig 1 Abb 1 5 3 4 2 1 7 6 5 9 8 10 1 11 12...

Page 6: ...azione tenendo conto delle misure della contropiastra di fon dazione 2 Alloggiare nello scavo le canaline di adduzione dei cavi di alimentazione e di col legamento esterno 3 Eseguire il montaggio cont...

Page 7: ...folgt zu verfahren 1 Einen Aushub entsprechend den Abmes sungen der Fundamentsplatte durchf hren 2 Die Versorgungsschienen der Zufuhrkabel und der externen Anschl sse in dem Aushub verlegen 3 Die Mont...

Page 8: ...e en position de barre baiss e 4 Fixer la barre la barri re 5 Effectuer les branchements lectriques n cessaires 6 Brancher le courant 7 Effectuer le r glage des but es de fin de course 8 Faire un essa...

Page 9: ...ion bringen 4 Die Stange an der Schranke befestigen 5 Die notwendigen Elektroanschl sse ausf hren 6 Die Stromversorgung einschalten 7 Die Einstellung der Endanschlagsnocken durchf hren 8 Den Betrieb d...

Page 10: ...e el grupo muelle a la posici n opuesta como muestra la fig 4 Para un correcto equilibrado coloque la barrera a 45 y ajuste con los tornillos de regulaci n hasta equilibrar el peso Invierta los cables...

Page 11: ...u versetzen wie in Abb 4 dargestellt F r eine korrekte Ausbalancierung die Stange auf 45 setzen und die Stellschraube bet tigen bis das Gewicht ausgeglichen ist Die Kabel des Motors umkehren ffnen und...

Page 12: ...la central electr nica The load required to stop the bar at the top should be less than 15daN The thrust force of the barrier may be adjusted from the electronic control unit Die f r die Blockierung d...

Page 13: ...queo al otro lado de RAP 3 invierta todos los componentes de bloqueo DESBLOQUEO DE LA BARRERA To release the barrier insert and turn the key counter clockwise fig 5 Should it be necessary to move the...

Page 14: ...erior de RAP 3 se encuentran los espacios para n 2 bater as a seco de 12V 1 9 Ah del tipo representado en la figura BATTERIES BATTERIEN BATTERIJEN GB D NL Two 12V 1 9 Ah dry batteries as shown in the...

Page 15: ...centrale lectronique serre c ble V ase el manual de la central electr nica tablero de bornes Refer to terminal boards in the electronic control unit handbook Siehe Handbuch der elektronischen Zentral...

Page 16: ...emmerd wordt c Ga na dat de RAP 3 niet ontgrendeld is 1 La barriera non si aziona Il motore elet trico non funziona e non si avverte quin di alcun rumore o vibrazione a Verificare che la centralina el...

Page 17: ...ersonal especializado 1 Always keep the power supply and control cables separate 2 Prevent the possibility of crushing by fitting the installation with the recommended safety devices particularly the...

Page 18: ...18 34 35 36 37 38 25 39 40 41 44 43 42 32 38 31 30 29 22 23 24 25 26 28 21 20 19 27 18 17 13 15 13 14 16 10 10 11 12 8 9 1 2 7 6 5 4 3 RAP 3...

Page 19: ...ort barre RAP 3 Passage c ble GW50432 F48 Bouchon de couverture d verrouillage Armoire pour RAP 3 Bouchon de couverture d verrouillage Plaque de fixation Ecrou M14 Rondelle D 14 Agrafe de fixation Cof...

Page 20: ...F48 Stopfen Geh use f r RAP 3 Stopfen Verankerungsplatte Mutter M14 Unterlegscheibe D 14 Befestigungshaken Box f r Steuerzentrale Schraube M3x15 dreilappig Eektronische Steuerzentrale Schraube M2 9x1...

Page 21: ...45 46 47 48 49 50 61 62 69 70 71 72 73 74 75 73 63 64 65 66 67 65 64 68 56 57 58 59 56 60 54 55 53 52 51 21...

Page 22: ...to Support tournant pour encodeur Vis M5x16 UNI 5931 TCCE zn Rondelle D 6 Moteur 24V cc 5000t min Vis M3x15 trilob e Encodeur magn tique Entretoise pour lecteur magn tique Ressort de d blocage Languet...

Page 23: ...r ger f r Encoder Schraube M5x16 UNI 5931 TCCE zn Unterlegscheibe D 6 Motor 24V cc 5000 UPM Schraube M3x15 dreilappig Magnetischer Encoder Abstandshalter f r manetischen Leser Feder f r die Entriegelu...

Page 24: ...Telcoma srl via Postumia Est 68 31048 S Biagio di Callalta Tv Italy Tel 0422 890190 Fax 0422 890245 part IVA 03069910267 http www telcoma it E mail info telcoma it...

Reviews: