All waste materials (glue, silicon,
seals)
must
be
placed
in
special
containers and taken to official waste
disposal centres
.
4.2.2 Opening a new hole
Choose a central area of the roof between
two side members and trace the outline of a
360 mm square with a felt-tip pen (fig.2) and
(fig. 4 ref. 1).
The size of the 360x360 mm
opening,
shown
on
the
cardboard
template (Fig.2), is purely indicative.
Before cutting the roof, check the actual
size of the hole with a measuring tape.
Cut the new opening in the roof carefully with
a saw: be careful not to cut any electrical
wires (fig. 4 ref. 2).
Fix a reinforcement frame around the
opening (fig. 5).
4.2.3 Power lead
A 3-core cable with a 2.5 mm² cross-section
(live-neutral-earth) must be routed for the
power supply of the air conditioner. The wires
at one end must be connected to the thermal
magnetic circuit breaker (recommended load
10A) previously installed in the vehicle’s
electrical distribution panel exclusively for the
air conditioner. The other end should reach
the opening made in the roof of the vehicle
and protrude from the hole in the reinforcing
frame by approximately 50 cm in order to
facilitate connection to the air conditioner
(Fig. 6).
The electrical cable must be suitably
protected in order to ensure its integrity and
insulation in all conditions of use of the
vehicle.
Summary of Contents for ice S2800
Page 1: ...MANUAL FOR INSTALLATION AND USER MANUAL v 001 May 2021...
Page 21: ...Rev 001 ICE S 2800 21 10 SPARE PARTS LIST...
Page 22: ...ICE S 2800 Rev 001 22...
Page 25: ...Rev 001 ICE S 2800 25 Notes...
Page 26: ...ICE S 2800 Rev 001 26 Notes...
Page 27: ...Rev 001 ICE S 2800 27 Notes...
Page 28: ...ICE S 2800 Rev 001 28...