18. Slide the alternator drive belt to the compressor and over the alternator. Apply tension to
the belt and firmly fasten all bolts. See previous photo.
19. Re-connect the engine drive shaft.
20. Re-connect the wiring harness onto the alternator.
21. Re-install the muffler.
Cab installation can now begin.
Cab Installation Instructions:
1. Remove the upper 2-post ROPS hoop structure.
2. Tilt the seat box forward. Take the provided 90° bulb seal weather stripping, and install
along the outside edge of the seat box so that the bulb is facing towards the outer tanks.
3. Take the provided left tank panel floormat piece, along with the Christmas tree fasteners
provided. Slide the floormat through the control levers in the left tank and slide mat down
onto tank. Use the fasteners provided and push them through the floormat and into the tank.
June 2021© New Holland G6030/6035 ROPS Cab Installation Manual