Earth ground
Double insulated
Fuse
Conforms to European Union directives
1.3 Instructions
* Remove test leads from the Meter before opening the
Meter case or battery cover.
* When servicing the Meter, use only specified replacement
parts.
* Before opening up the instrument, always disconnect from
all sources of electric current and make sure you are not
charged with static electricity, which may destroy internal
components.
* Any adjustment, maintenance or repair work carried out on
the meter while it is live should be carried out only by
appropriately qualified personnel, after having taken into
account the instructions in this present manual.
* A "qualified person" is someone who is familiar with the
installation, construction and operation of the equipment
and the hazards involved. He is trained and authorized to
energize and de-energize circuits and equipment in
accordance with established practices.
* When the instrument is opened up, remember that some
internal capacitors can retain a dangerous potential even