TKR1201
TKR1443
TKR5102A
TKR1443
Note: On steps K-2 and K-3, do not
tighten the screws all the way down until
the assembly steps are complete. Position
the entire front assembly on the chassis
and tighten each screw evenly.
TKR1522
TKR5166
TKR1443
TKR1344
TKR1344
TKR1343
TKR5062
TKR1529
TKR1221
TKR1522
M3x8mm Cap Head Screw
x1
TKR1343
M4x10mm Flat Head Screw
x2
TKR1344
M4x12mm Flat Head Screw
x6
TKR1201
M3 Lock Nut Black
x2
TKR1443
M4x10mm Button Head Screw
x5
TKR1529
M3x20mm Cap Head Screw
x2
TKR1221
M3x8mm Washer
x8
Step
K-3
Step
K-1
Step
K-2
Thread
Lock
Thread
Lock
Note: Step K-1:
Line up the bottom of the
steering posts (TKR5102A)
with the corresponding recess
cut in the chassis.
Note: Inititial bumpsteer setting is four
washers below the steering ball link.
Bag K
Front End Assembly
15
Summary of Contents for ET48.3
Page 1: ......
Page 26: ......
Page 27: ......
Page 28: ...Tekno RC 10755 Scripps Poway Pkwy 598 San Diego CA 92131 USA...