background image

C

17 18

Sen

10K

0.4

2.0

3.6

Heating Curve

22

°

F

2

42

Dem

R

1

2

5

6

7

8

Pmp

Two Stage Boiler & DHW Control 252

Dem

Heat

System

Pmp

11 12

19

Com

Sw

UnO

20 21

Sen

Sup

140

°

F

80

200

DHW

120

°

F

Off

170

Minimum

Supply

Boiler 

Differential

80

Power Supply:  24V 60Hz 3VA
Relay capacities: 24V 10A

Test

No power here

Maximum 24 volts

Dem

3

4

Dem

Stage

Sen

Occupied

35 
(2)

105
(41)

70

°

F

(21

°

C)

Unoccupied

35 
(2)

105
(41)

70

°

F

(21

°

C)

H1072

Date

S/N

1492
1234567

1

1

13 14

Stage

2

2

Power

Heat
Demand

DHW
Demand

WWSD

Stage 1

Stage 2

UnOcc.

Minimum

1

2

3

4

5

6

7

8

Auto

Stage

1   2

Perm. Heat Demand

External Heat Demand

Indoor sensor

Zone control

DHW during unoccupied
DHW priority

Rotate

Off

9 10

Pmp

DHW

Pmp

DHW

15 16

Sen

DHW

22

Out

Sen

Com

Sen

RTU

2K

DHW valve

DHW pump

DHW
pump

System
pump

Power

- Data Brochure

Two Stage Boiler & DHW Control 252

The tekmar Two Stage Boiler & DHW Control 252 is a microprocessor-based control
which regulates the supply water temperature from one or two boilers by turning them
on or off.  The supply temperature is based on the outdoor, and optionally, the indoor
air temperatures.  When  Domestic Hot Water (DHW) is required, the control will operate
the boiler(s) to regulate the supply water temperature in order to satisfy the DHW
requirements.

D 252

Operating Mode

selector switches

Terminal Plugs:

Power and out-

put connections

Terminal Plug:
Sensor and
timer inputs

Outdoor Reset Strategy . . pg. 2

Testing . . . . . . . . . . . . pg. 10

Sequence of Operation . . pg. 3

Error Messages . . . . . pg. 11

Installation . . . . . . . . . . . . pg. 4

Technical Data . . . . . . pg. 12

Settings . . . . . . . . . . . . . . . pg. 7

Limited Warranty . . . . pg. 12

10/92

Heating

is required

24Vac power

supply is on

System is in

Warm Weather

Shut Down

System is

switched to

Unoccupied

Control is

maintaining

Minimum Supply

DHW

pump or valve

is on

DHW

is required

System Pump

is on

Occupied

temperature

setting

Heating Curve
setting

DHW
temperature
setting

Boiler
Differential
setting

Minimum
Supply setting

Test button &
LED to test
main control
functions

Stage 2 is on

Stage 1 is on

Unoccupied

temperature

setting

Input: 2K RTU

Optional

Input:

Indoor Sensor

074 

Optional

Input:

Unoccupied

signal.

Optional

Input: DHW Sensor

071 

Optional

Output: Turn

on stage #1

Output: Turn

on stage #2

Output: Turn on

System Pump

Output: Turn on

DHW Pump / Valve

24Vac power supply

Note:  Wiring
is detailed in
Application
Brochure

A 252

Input: Outdoor

Sensor 070

Included

Input: Universal
Sensor 071.  

Included

Input:
Heat Demand
signal. 

Optional

Input: DHW Demand
signal. 

Optional

Two Stage Boiler & DHW Control 252

Power

Heat
Demand

WWSD

UnOcc.

Minimum

Stage 1

Occupied

35 

(2)

105

(41)

70

°

F

(21

°

C)

Unoccupied

35 

(2)

105

(41)

70

°

F

(21

°

C)

Stage 2

System
Pump

DHW
Demand

DHW
Pump

Summary of Contents for DHW Control 252

Page 1: ...n order to satisfy the DHW requirements D 252 Operating Mode selector switches Terminal Plugs Power and out put connections Terminal Plug Sensor and timer inputs Outdoor Reset Strategy pg 2 Testing pg...

Page 2: ...lected is too low the heating system will not supply hot enough water to keep the room temperature warm during colder weather If the Heating Curve selected is too high the supply water will be too hot...

Page 3: ...emperature supply temperature and indoor temperature optional Whenever 3 days pass with the control in uninterrupted WWSD the system pump will be cycled on for 20 seconds to help prevent it from seizi...

Page 4: ...mperature reaches the heating curve desired temperature plus one half thedif ferential setting where the Stage light s will turn off and the boiler s will be shut off Note Whenever the boiler s are tu...

Page 5: ...nnections The installer should test to confirm that no voltage is present at any of the wires Install the control into the base sliding it down until it snaps into place All electrical connections are...

Page 6: ...2K RTU Com Sen 20 Sup Sen 21 Out Sen Com Sen 22 Stage DHW DHW Sensor optional 071 DHW Sen DHW 10K Indoor Sensor 074 or Zone Control optional 10A 10A 10A DHW Demand When DHW requested and there is no D...

Page 7: ...and ensure that it is powered up and the voltage is correct Check the devices in the circuit limits flow switches etc for faults If the boiler operates properly when the circuit is powered up disconn...

Page 8: ...ls Com Sen UnO Sw 17 and 18 are shorted out the control switches from operating at the Occupied dial setting to operating at the Unoccupied dial setting When a tekmar Zone Control or 2K RTU RoomTemper...

Page 9: ...C above the desired temperature Delays of 8 seconds to 3 minutes for staging off depend on the degree of control error Within the differential range no boilers are staged on or off Trial setting 22 F...

Page 10: ...mp will remain on After the 5 minutes the control will automatically exit the test routine and enters the normal operating mode If there is no DHW Demand the control will not allow a pause and will pr...

Page 11: ...door Sensor or RTU input becomes shorted out the Occupied and Unoccupied dial settings will become active After any repair has been completed press the Test button to allow the control to cycle throug...

Page 12: ...bour to remove transport or reinstall a defective product tekmar will not be liable for any damage other than repair or replacement of the defective part or parts and such repair or replacement shall...

Reviews: