teel 4P035A Operating Instructions & Parts Manual Download Page 9

Installation (Continued)

water level while the pump is
running in order to prevent the
pump from sucking air.

4. Install a sanitary well seal and

connect the ejector piping to the
pump. Use steel nipples through the
well seal with flexible poly pipe to
avoid crushing the plastic pipe when
tightening the seal.

5. Support the pipe so that there are

no dips or sags in the pipe, so it
doesn’t strain the pump body, and
so that it slopes slightly upward
from the well to the pump (high
spots can cause air pockets which

can air lock the pump). Seal the
suction pipe joints with teflon tape
or a teflon based pipe joint
compound. Joints must be air- and
water-tight. If the suction pipe can
suck air, the pump cannot pull
water from the well.

You have just completed the plumbing
for your new double pipe deep well
jet pump. Please go to Pages 9 and 10
for Discharge Pipe and Tank 
Connections.

2” WELL (FIGURE 11)

1. Mount the pump as close to the

well as possible. 

2. Assemble ejector package 2P484

(sold separately), well piping, and
well head adapter according to the
instructions provided with the
ejector package (See Figure 11). Use
galvanized drop pipe with turned
couplings to allow proper flow.
Follow the instructions included
with the kit in order to match the
nozzle and venturi to your well
conditions.

3. Run two pipes (one smaller drive

pipe, one larger suction pipe) from
the well to the pump. Support the
pipe so that there are no dips or
sags in the pipe, so it doesn’t strain
the pump body, and so that it slopes
slightly upward from the well to the
pump (high spots can cause air
pockets which can air lock the
pump). Seal the suction pipe joints
with teflon tape or a teflon based
pipe joint compound. Joints must be
air- and water-tight. If the suction
pipe can suck air, the pump cannot
pull water from the well.

You have just completed the plumbing
for your new single pipe deep well jet
pump. Please see below and Page 10
for Discharge Pipe and Tank 
Connections.

DISCHARGE PIPE & TANK
CONNECTIONS (FIGURE 12, 
PAGE 10)

1. Install a close nipple and a tee in the

pump discharge port (See Figure
12). The pipe size must be at least as
large as the discharge port. Run a
pipe or reinforced hose from one
arm of the tee to the port on the
pre-charged tank.

Models 4RJ47, 4RJ48, 4RJ49, 4RJ50, 4P035A and 4P036A

9

Teel Operating Instructions and Parts Manual

®

E

N
G

L

I

S

H

20

40

60

80

100

2322 0296

Not

to

Scale

Well

Head

Drive (Small)
Pipe to Well

Venturi

Nozzle

Ejector

Foot Valve

Strainer

Suction (Large)
Pipe from Well

20

40

60

80

100

To Household
Water System

Pressure Gauge 

Relief 
Valve

Priming Port

Control Valve

Figure 10 – 4” and Larger Deep Well

Figure 11 – 2” (Single Pipe) Deep Well

20

40

60

80

10

0

2323 0296 

J

E

T

  

N

O

.

J

3

2

P

-2

4

20

40

60

80

10

0

To Household
Water System

Not

to

Scale

Relief Valve

Priming Port

Control Valve

Drive (Small)
Pipe to Well

Well Casing
serves as
Drive Pipe

Suction Pipe

Venturi

Nozzle

Ejector

Pressure Gauge

Summary of Contents for 4P035A

Page 1: ...fusers are highly stable high heat thermoplastic Teel convertible jet pump system Model 4RJ49 is a heavy duty convertible jet pump mounted on a 30 gallon horizontal tank Use it on shallow wells up to...

Page 2: ...motor before connecting to power supply Meet United States National Electri cal Code Canadian Electrical Code and local codes for all wiring Follow wiring instructions in this manual when connecting...

Page 3: ...20 30 40 50 20 30 40 50 GPH w J32P 24 Venturi 54 Nozzle GPH w J32P 32 Venturi 55 Nozzle GPH w J32P 24 Venturi 54 Nozzle 30 580 420 260 125 900 660 400 140 1070 865 635 385 40 485 325 180 48 720 520 26...

Page 4: ...0 525 420 320 230 640 565 450 310 80 465 370 285 200 550 470 355 215 GPH w J32P 22 Venturi 53 Nozzle GPH w J32P 22 Venturi 54 Nozzle 90 320 250 190 135 400 345 290 230 100 280 225 170 120 350 300 250...

Page 5: ...40 385 195 370 325 275 235 60 511 486 378 240 585 420 240 66 340 295 250 210 70 438 408 306 186 305 260 220 180 80 354 330 234 132 275 235 195 155 90 240 200 165 125 100 215 180 145 105 110 165 135 10...

Page 6: ...n the venturi with the top hole on the front of the pump See Figure 5 NOTE Always replace the ejector when replacing the pump in a shallow well installation 3 Install the pump in the system Make sure...

Page 7: ...LLATION 2 OR LARGER CASING FIGURE 7 1 Install ejector package 2P429A ejector is included on Model 4RJ49 pump tank system For other heavy duty jet pumps kits are sold separately Follow the instructions...

Page 8: ...lon tape or a teflon based pipe joint compound on threaded pipe joints Protect the foot valve assembly from fish trash etc by installing a screen around it See Figure 9 4 Lower the pipe into the water...

Page 9: ...e from the well to the pump Support the pipe so that there are no dips or sags in the pipe so it doesn t strain the pump body and so that it slopes slightly upward from the well to the pump high spots...

Page 10: ...n tubing from the pump s AVC port to the port on the AVC mounted on the tank See instructions provided with tank and AVC for details You have just completed the tank connection for your jet pump Pleas...

Page 11: ...B L2 L1 A B L2 L1 A B L2 L1 230 Volt to 115 Volt Conversion Spade Connector Type Move black wire from A to L1 1 1 2 2 3 3 230 Volt to 115 Volt Conversion Plug in Type Pull plug straight out from termi...

Page 12: ...d lead in a service panel to a metal underground water pipe to a metal well casing at least ten feet 3M long or to a ground electrode provided by the power company or the hydro authority 4 Connect the...

Page 13: ...rder to get all the trapped air out of the piping Don t forget to close the control valve each time before you start the pump 5 When pressure has built up and stabilized at about 50 psi slowly open th...

Page 14: ...ressure in the system and shut off check the pressure switch operation by opening a faucet or two and running enough water out to bleed off pressure until the pump starts The pump should start when pr...

Page 15: ...er from seal plate See Figure 24 Exposed impeller can now be cleaned 2 If impeller must be replaced loosen two machine screws and remove motor canopy If motor has a capacitor go to step 3 If motor doe...

Page 16: ...piping 11 Prime pump as described under Operation REMOVING OLD SEAL 1 Follow instructions under Pump Disassembly 2 Follow steps 1 through 5 under Cleaning Replacing Impeller 3 Remove rotating half of...

Page 17: ...Operation 4 Check for leaks HELPFUL HINTS HOW TO AVOID OVERPUMPING A SHALLOW WELL In the section on Priming the Shallow Well Pump the instructions were to open the control valve all the way after the...

Page 18: ...ve assembly L262 4PS L262 4PS L262 5PS L262 5PS L262 5PS 1 12 Pump body L76 48A L76 48A L76 49A L176 40 L176 40 1 13 1 4 NPT Drain plug 1 14 1 8 NPT Pipe plug 1 15 1 4 NPT Barbed fitting st 1 16 Switc...

Page 19: ...r bushing 1 7 1 NPT Pipe plug 1 8 1 8 NPT Bayonet fitting 1 9 AVC Tube U37 626P 1 10 Air volume control U238 4 1 11 1 4 NPT Bayonet elbow 1 12 1 4 NPT x 11 2 Nipple 1 13 3 8 16 x 11 4 lg Carriage bolt...

Page 20: ...s on nozzle instead of part number 1 Check valve assembly N212 12P 1 2 1 8 NPT sq hd teflon taped pipe plug 2 3 Ejector body N40 92 1 4 Nozzle 1 each 55 J34P 45 1 51 J34P 41 1 5 Gasket N20 25 1 6 Vent...

Page 21: ...ler is plugged 3 Clean ejector or impeller see Maintenance 4 Check or foot valves stuck in closed 4 Replace check valve or foot valve position 5 Frozen pipe 5 Thaw pipes Bury pipes below frost line He...

Page 22: ...m Certain aspects of disclaimers are not applicable to consumer products e g a some jurisdictions do not allow the exclusion or limitation of incidental or consequential damages so the above limitatio...

Reviews: