71
DXBA408
Rev_14
16 – INSTRUCTION FOR AUTOCLAVE SHIPPING
In case the autoclave must be shipped for repairs, controls, reactivation, revisions, validations follow the
obligatory indications below:
1 – Use the original packaging; if this is no longer in your possession, use adequate packaging. The
merchandise travels at risk to the sender.
2 – Ship only the autoclave, always removing trays and tray carrier.
3 – Carefully clean the sterilization chamber and autoclave in general before shipping. In case it arrives dirty or
with residual the autoclave with be returned without being repaired, or it will be put through a cleansing action
and disinfection.
4 – Always empty the clean water tank through the attachment located on the back of the autoclave (fig. 10
pos.3).
5 – Always empty the used water tank through the attachment located on the back of the autoclave (fig, 10
pos. 4).
FIGURE 10
Frontal view 1.3
Pos. 3
6 – Indicate by letter and insert in the package a document which indicates precisely the irregularity or service
desired.
7 - Ship at your expense, otherwise you will be billed for shipping.
ATTENTION
All non original packaging which arrives will be disposed of.
Autoclave will be returned with new and original packing to insure maximum protection for your
autoclave during shipping.
Cost of packaging will be charged to client.
Summary of Contents for Europa B xp
Page 31: ...31 DXBA408 Rev_14 SCHEMA DI COLLEGAMENTO DEL DEMINERALIZZATORE VALIDO FINO AL 11 05...
Page 32: ...32 DXBA408 Rev_14 SCHEMA DI COLLEGAMENTO DEL DEMINERALIZZATORE VALIDO DAL 12 05...
Page 67: ...67 DXBA408 Rev_14 CHEME OF CONNECTION OF THE VALID DEMINERALIZER UNTIL THE 11 05...
Page 68: ...68 DXBA408 Rev_14 SCHEME OF CONNECTION OF THE VALID DEMINERALIZER FROM THE 12 05...
Page 104: ...104 DXBA408 Rev_14 SCHEMA DE BRANCHEMENT DU DEIONISATEUR VALIDE JUSQU AU 11 05...
Page 105: ...105 DXBA408 Rev_14 SCHEMA DE BRANCHEMENT DU DEIONISATEUR VALIDE DU 12 05...
Page 141: ...141 DXBA408 Rev_14 ESQUEMA DE ENLACES DEL DESMINERALIZADOR V LIDO HASTA EL 11 05...
Page 142: ...142 DXBA408 Rev_14 ESQUEMA DE ENLACES DEL DESMINERALIZADOR V LIDO DEL 12 05...
Page 178: ...178 DXBA408 Rev_14 ANSCHLUSSCHEMA DES G LTIGEN ENTZSALZERS BIS DAS 11 05...
Page 179: ...179 DXBA408 Rev_14 ANSCHLUSSCHEMA DES G LTIGEN ENTZSALZERS VOM 12 05...