TSR 2800-30 Hardware Installation Manual
-7-
For location planning and device locating, refer to section 2.3.2 “Location
Configuration Prevention”.
2.3.2
Location Configuration Prevention
The following preventive measures assist you to design the proper environment for
the router.
z
Make sure that the workshop is well-ventilated, the heat of electrical devices
is well-discharged and sufficient air circulation is provided for device cooling.
z
Avoid to damage devices by following the electrostatic discharge prevention
procedure.
z
Put the chassis at the place where cool air can blow off the heat inside the
chassis. Make sure the chassis is sealed because the opened chassis will
reverse the cool air flow.
2.3.3
Cabinet Configuration
The following content assists you to make a proper cabinet configuration:
z
Each device on the cabinet gives off heat when it runs. Therefore, the sealed
cabinet must have the heat-discharge outlet and the cooling fan. Do not put
the devices too close, avoiding bad ventilation.
z
When you install the machine box at the open cabinet, prevent the frame of
the cabinet from blocking the airway of the machine box.
z
Ensure that nice ventilation is provided for the devices installed at the
bottom of the cabinet.
z
The clapboard separates exhaust gas and inflow air, and boost the cool air
to flow in the chassis. The best location of the clapboard is decided by the
air flow mode in the chassis, which can be obtained through different
location tests. Power Requirements
Make sure that the power supply has nice grounding and the power at the input
side of the router is reliable. The voltage control can be installed if necessary. At
least a 240 V, 10A fuse or a breaker is provided in the phase line if you prepare the
short-circuit prevention measures for a building.
Caution:
If the power supply system does not have good grounding, or the input power
disturbs too much and excessive pulses exist, the error code rate of
communication devices increases and even the hardware system will be
damaged.
2.4 Installation Tools and Device
The tools and devices to install the router are not provided. You need to prepare
them yourself. The following are the tools and devices needed for the typical
installation of the router:
z
Screwdriver
z
Static
armguard
z
Bolt
z
Cable for LAN connecting WAN
z
HUB or PC with Ethernet card
z
Control
terminal