background image

                                      TSR 2800-30 Hardware Installation Manual 

-6- 

Safety Principles for Live Working 

z

 

Put off ornaments, such as ring, necklace, watch and bracelet, before you 
operate under live working. When metal articles connect the power to the 
ground, short circuit happens and components may be damaged. 

z

 

Pull out the AC power socket and close the direct-current power before 
operating on the chassis or working beside the power source. 

z

 

When the power is on, do not touch the power. 

z

 

Correctly connect the device and the power socket. 

z

 

Only professionals are allowed to operate and maintain the device. 

z

 

 

Read the installation guide carefully before the system is powered on. 

Note: 

1)  

Check potential dangers, such as the humid floor, ungrounded extensible 
power line and tatty power line. 

2)   Install the emergent on-off at the working room for turning off the power 

when trouble happens. 

3)  

Turn off the power on-off of the router and plug off the power line before 
installing or uninstalling the machine box or working beside the power. 

4)   

 Do not work alone if potential dangers exist. 

5)   

 Cut off the power before checkout. 

6)   

 If trouble happens, take the following measures: 

A.  Cut off the system’s power. 

B. Alarm. 

C.  Take proper measures to help persons who are hit by the disaster. 

Artificial respiration is needed if necessary. 

D.  Seek for medical help, or judge the loss and seek for available help.

 

 

Electrostatic Discharge Prevention 

Electrostatic discharge may damage devices and circuits. Improper treatment may 
cause the router to malfunction completely or discontinuously. 

Move or locate the devices according to the measures of electrostatic discharge 
prevention, ensuring the chassis connects the ground. Another measure is to wear 
the static-proof hand ring. If there is no hand ring, use the metal clip with the metal 
cable to clip the unpainted metal part of the chassis. In this case, the static is 
discharged to the ground through the metal cable of the clip. You can also 
discharge the static to the ground through your body. 

2.3  

       

Requirements for Common Locations 

This part describes the requirements for the installation locations. 

2.3.1   

   

Environment 

The router can be installed on the desk or the cabinet. The location of the chassis, 
cabinet planning and indoor cabling are very important for normal system’s 
function. Short distance between devices, bad ventilation and untouchable control 
plate will cause maintenance problems, systematic faulty and breakdown. 

Summary of Contents for TSR 2800-30

Page 1: ...TSR 2800 30 Hardware Installation Manual...

Page 2: ...1 Installation Procedure of TSR 2800 30 Router 9 3 2 Installing Router s Hull 9 3 2 1 Installing the Machine Box on the Desk 9 3 2 2 Installing the Chassis on the Cabinet 10 3 3 Connecting the Port 1...

Page 3: ...tors USB port USB2 0 port There are also three interface card slots one power socket one power on off one grounding column one ventilation vent and one long shape ventilation vent The front template o...

Page 4: ...arts at the back template of TSR 2800 30 No Abbrev Name Remarks 1 Power AC power socket AC100 240V 2 SWITCH Power switch ON means the switch is opened while OFF means the switch is closed 1 2 Characte...

Page 5: ...TSR 2800 30 Hardware Installation Manual 4 Power Source s Characteristics AC power Power consumptio n Up to 40W Input voltage 100 240V Input frequency 50 60Hz Input current 1 5A 1 3 ROHS Description...

Page 6: ...hen the lifetime of our products ends handle them according to national laws and regulations or send these products to our company for collective processing 2 2 Safety Advice Safety Principles z Keep...

Page 7: ...take the following measures A Cut off the system s power B Alarm C Take proper measures to help persons who are hit by the disaster Artificial respiration is needed if necessary D Seek for medical he...

Page 8: ...of the cabinet from blocking the airway of the machine box z Ensure that nice ventilation is provided for the devices installed at the bottom of the cabinet z The clapboard separates exhaust gas and i...

Page 9: ...TSR 2800 30 Hardware Installation Manual 8 z MODEM...

Page 10: ...the desk or can be fixed to other cabinets Your network installation requirements can be met if you conduct the operations according to the following procedure It can be described in the following tw...

Page 11: ...ole port Its attributes and usage method are described in this section 1 Console port The console port has a rate of 1200bps to 115200bps and a standard RJ45 plug the parity check is an option for the...

Page 12: ...a transmitting TXD Output 5 Transmission requesting RTS It is used to connect the Modem 7 Data terminal ready DTR It is used to connect the Modem 8 Signal ground SG The cable is used to connect the co...

Page 13: ...auto adaptation Ethernet port provides the UTP RJ45 interface and has the link ACT indicators The 10 100M auto adaptation Ethernet port can be connected to the UTP port of the router and then to HUB...

Page 14: ...ing and receiving the normal phase of data 0 TP0 2 Sending and receiving the paraphase of data 0 TP0 3 Sending and receiving the normal phase of data 1 TP1 4 Sending and receiving the paraphase of dat...

Page 15: ...of USB2 0 The USB port works in main mode which can be plugged into the sub device 3 3 4 Connecting Ethernet 1000M Optical Port To use the optical port you need connect it to the SFP optical module a...

Page 16: ...NIC into a slot Type of NIC No Module ID 1 Single path E1 card HIC 1E1 2 Dual path E1 card HIC 2E1 3 Single path T1 card HIC 1T1 4 Dual path T1 card HIC 2T1 5 Single path serial card HIC 1T 6 Dual pat...

Page 17: ...outer you may use the following tools These tools are z Crossed screwdriver z Static armguard Perform the following steps to open the cover of the router 1 Turn off the power on off of the router 2 Pl...

Page 18: ...igure 3 When the cover and the bottom are closely tied let the cover slide the slot of the front template at the bottom 4 Nail the bolt and screw it tightly with the screwdriver 5 Reinstall the router...

Page 19: ...is on check the power 5 1 2 Faults Relative with Port Cable and Connection Do the following checkups to help remove the fault z Check the cable if the router cannot find the port z If the power on off...

Page 20: ...ch are written in this manual but do not belong to the company belong to their owners respectively Disclaimer of warranty provides no evident or hinted guarantee towards the contents of this manual In...

Reviews: