
DUT-E installation / Probe cutting according to tank depth
DUT-E fuel level sensors. Operation manual. Version 8.1
©
Technoton, 2020
29
2.4 Probe cutting according to tank depth
ATTENTION:
DUT-E AF/232/485/CAN
allow cut off up
to any required probe
length
with mandatory further calibration.
DUT-E A5/A10/F/I
allow cut off
up to 30 %
of the initial length of the measuring
probe with no further calibration.
cutting procedure instructions:
1)
Measure the depth of the tank from mounting plate to the bottom.
IMPORTANT:
It is
required to leave a 20
…
30 mm gap
between the edge of the
measuring probe and the tank bottom to:
• provide at least 10
mm operation area for bottom spring stopper (if the bottom
spring is fixed in full loading position the bayonet mounting plate can get damaged);
• avoid the short circuit of the measuring probe tubes with conductive mud or water
at the tank bottom.
2)
Cut off DUT-E probe so that the edge of the probe is in 25 mm above the bottom of the
tank.
Figure 14
—
DUT-E measuring probe cutting
RECOMMENDATION:
Cut DUT-E probe with a metal hacksaw. Carefully clean the
edge and wash the tubes with clean fuel (see figure 14).
3)
After cutting the measuring probe of DUT-E AF/232/485/CAN models, you need to carry out