Page 1: ...2005 M20 AT USER MANUAL...

Page 2: ...HE M20 SNOW MACHINE 11 5 2 STARTING AND MONITORING THE M20 SNOW MACHINES FROM DATA FIELD STATUS 15 6 0 LEVEL 2 18 6 1 SETTING THE SNOW QUALITY 19 6 2 SETTING THE WATER PRESSURE 20 6 3 SETTING THE AUTO...

Page 3: ...ing and stop phase will be regulated automatically and during operation the snow machine sets itself according to the environmental conditions Block scheme Swinging Compress Spotlight Air temp Atass H...

Page 4: ...automatic hydrant of the Hydromat SE is installed the snow machine can also independently set the water pressure to the required operating pressure Automatic Hydrant recognition 24 V extern Automatic...

Page 5: ...3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 cable 10x1 5mm cable 10x1 5mm 24V extern hydromat present start extern stop extern hydromat 2000 present hydrant open hydrant closed pit recogn...

Page 6: ...s equipped with an electrical keyboard for manual operation and can if necessary be directly mechanically operated on the equipment 1 2 THE SERVICE CONSOLE OF THE AUTOMATIC SNOW MACHINE The operating...

Page 7: ...for automatic operation the lower white part for manual operation 2 1 OPERATION OF DISPLAY DIFFERENT MENUS AND VARIOUS LEVELS The display has 2x20 symbols The first line of the display shows the oper...

Page 8: ...NTER key will be used to move from level 1 to level 2 and further or to confirm changes A menu can be chosen with the key too KEYS TO SWITCH BETWEEN AUTOMATIC OPERATION AND MANUAL Key for automatic op...

Page 9: ...measured from 0 to 60 bar and converted into a measurement signal between 4 and 20 mA the water temperature will be measured from 10 C to 30 C and converted into a signal between 4 and 20 mA 3 2 THE P...

Page 10: ...WATER CAPACITY WATER TEMP LEVEL 2 SNOW QUALITY TARGET PRESSURE AUTOMATIC SNOW READY SHAFT NUMBER SWING TARGET POS VERTICAL LIGHT LEVEL 3 SOFTWARE VERSION LANGUAGE STORE E2PROM EBENE 1 WASSERDRUCK REL...

Page 11: ...ture 30 30 C Water pressure 10 40 bar Relative air humidity 0 100 Humid bulb temperature 0 10 C Water temperature 10 30 C Water capacity 0 15 l s Status Status of the snow machines The data in level 1...

Page 12: ...on A sign now appears on the display 2 Connect the water supply to the snow machine Attention Before starting the snow machine all the safety instructions must be read through and followed in a preci...

Page 13: ...LUFTTEMP LEVEL 1 AIR TEMP WATER PRESS REL HUMIDITY HUMID BULB STATUS WATER CAPACITY WATER TEMP Bild 2 illustration 2 If the machine is to be started Press the START key ATTENTION During the starting p...

Page 14: ...ASSERDRUCK REL FEUCHTE STATUS WASSERDURCH WASSERTEMP LUFTTEMP LEVEL 1 AIR TEMP WATER PRESSURE REL HUMIDITY HUMID BULB TEMP STATUS WATER CAPACITY WATER TEMP Bild 5 Illustration 5 After the warm running...

Page 15: ...orrect running of the machine even when it is in automatic mode ATTENTION When the machine is in operation do not stand in front or at the back of the running turbine At all times operation running ph...

Page 16: ...ON In the case of an apparent machine error the warning light will flash 5 2 STARTING AND SUPERVISING THE M20 SNOW MACHINE WITH THE STATUS DATA FIELD EBENE 1 WASSERDRUCK REL FEUCHTE STATUS WASSERDURCH...

Page 17: ...heating will be switched on and shown on the display illustration 11 Bild 9 Illus 11 After the startup phase in which the heating always remains on the heating will constantly be switched on and off...

Page 18: ...n the case that a swing width larger than 0 is set Then the turbine will start off and the hydrant will be opened if an automatic hydrant is connected illus 15 In the case that only a manual hydrant h...

Page 19: ...s then an error report appears on the display and the machine keeps running as long as the water pressure does not sink to under 2 bar The automatic hydrant needs a shorter switch off time With the cl...

Page 20: ...parameters it contains 8 settings Snow quality 1 9 target pressure 10 40 bar Automatic operation on off Snow readiness spotlight on off Vertical position 0 5 Swing width 0 7 Shaft number 1 255 The par...

Page 21: ...density wet snow As a rule in level 5 snow is produced which suits skiing best Go through level 2 until snow quality appears on the display illustration 23 Bild 21 illustration 23 The pre set value is...

Page 22: ...TOMATIK SOLLPOS VER LICHT SCHNEIBEREIT SCHWENKEN SCHACHTNUMMER level 2 snow quality target pressure automatic snow readiness shaft number swing target pos vertical light The snow machine can be held i...

Page 23: ...and the START key pressed without Ready being there the cannon does not start and the Wait message appears illustration 27 The cannon then waits until the environmental conditions arrive at Snow read...

Page 24: ...OMATIK SOLLPOS VER LICHT SCHNEIBEREIT SCHWENKEN SCHACHTNUMMER level 2 snow quality target pressure automatic snow readiness shaft number swing target pos vertical light The M20 snow machine switches t...

Page 25: ...pressing the parameter choice key UP you can raise the value with the DOWN key you can decrease the value To confirm the given value you press the confirm key ENTER You have the 0 value for the verti...

Page 26: ...d using a lever and by means of swivel be brought into the required position Once the lever is let go the swing device blocks itself automatically With each swing angle the machine moves without pause...

Page 27: ...pends on The assumption for this is a corresponding recognition module in the ground outlet which will function by means of data cable Should the recognition module not be installed there is the possi...

Page 28: ...t the same time and you must be in level 2 To leave level 3 and go once more to level 1 press the ESC key HOW DO YOU EXPLORE LEVEL 3 To exchange from one information point to another in level 3 use th...

Page 29: ...E2 PROM symbol appears on the display illustration 34 Bild 32 Illus 34 The pre set standard setting is 1 If this value is to be changed simply press ENTER and the original value begins to flash With...

Page 30: ...discharger and the outlet valve of the filters will be heated After the heating phase the valve closes automatically and the control unit begins the heating on and off at given intervals the duration...

Page 31: ...tch then the vertical positioning can only follow manually if the the turbine is firstly lowered in the direction of the end switch Press the UP key the display lights with EDS end switch search If th...

Page 32: ...lacement is required Closed jets must be water tight otherwise try to solve the problem by repetitive opening and closing of the valve in manual operation Repeat testing of all the functions Snow tria...

Page 33: ...0 4 10 1 9 7 9 4 9 0 8 7 8 3 8 9 11 9 11 6 11 3 10 9 10 6 10 3 10 0 9 6 9 3 9 10 12 7 12 4 12 1 11 8 11 5 11 2 10 9 10 6 10 3 10 Approximately once an hour in the case of unfavorable weather condition...

Page 34: ...ion between control unit and valve card 2 has broken down the plug on the switch box ST8 could be wrongly fixed and is therefore to be tested the plug on the valve card of the Can comm could be wrongl...

Page 35: ...replaced W80 Swinging Warning swinging the Swinging process is clearly underway but the Hall sensor does not count an impulse the plug on the switch box ST5 or the plug on the motor to the horizontal...

Page 36: ...is not correctly fitted to the switch box ST12 F176 Turb aus The Turbine guard does not drop away in der Stop phase The machine goes on with the Stop phase The compressor guard K1M is probably blocked...

Page 37: ...TechnoAlpin M20 36 ADDITIONAL INFORMATION WHEN YOU PRESS A KEY THREE FIELDS LIGHT UP BRIEFLY IN THE LOWER LEFT CORNER OF THE DISPLAY AS CONFIRMATION...