background image

6

USING THE DG-1000 WITH THE MINNEAPOLIS BLOWER DOOR

Before the Test

•  Install the blower door frame, panel and fan into an exterior doorway. For instructions about how to do this, please see 

Chapter 2 of the Minneapolis Blower Door User Manual.

 

•  Prepare the building for the blower door test. For instructions about how to do this, please see 

Chapter 3 of the Minneapolis Blower Door Manual.

Tubing Hookup

1.  Attach one end of the red tube to the Channel B input tap. Attach the other end 

of the red tube to the pressure tap on the blower door fan. 

2.  Attach one end of the green tube to the Channel A reference tap. Run the other 

end of the tubing outside through one of the holes provided in the lower corner 

of the nylon panel.  

3.  Attach one end of the clear tube to the Channel B reference tap. Run the other end of the tubing outside through one of the 

holes provided in the lower corner of the nylon panel.  The end of the clear tubing should be placed next to the side of the fan, 

but not in the fan’s airstream.

Note: For help with how to connect the tubing to the DG-1000, please use the 

Tubing Assistant

 on our website.

Fan Direction

Before conducting the pressurization test, make sure the fan direction is reversed by 

removing the fan from the nylon panel, and re-inserting it with the exhaust side facing 

inside the building.

Conducting the Test

Once the equipment has been setup, follow the instructions in th

depressurization test section

 of this guide (page 2).

CONDUCTING A ONE-POINT PRESSURIZATION TEST

Reviews: