SX012/AXL012 Flange Facing and Grooving Machine
21
5.2 SETTING UP THE EQUIPMENT
The following instructions are for installing the flange facing and grooving machine
in position prior to operating the equipment. It is assumed that an appropriate air
supply is available for connection to the machine (1.6m3/min, 6 bar, 60cfm, 87 psi).
5.2.1 Unpacking the machine
Fig. 7 Packing case contents
(not shown: SX012 – twin drive additional motor)
The machine and associated job specific components are housed in a storage
case. The case contains the following:
1. Saddle assembly
1 off
2. Drive ring and bearing assembly
1 off
3. Adjustable clamping jaws
4 off
4. Toolpost
1 off
5. Lifting eyebolts
2 off
6. Air filter/lubricator unit and gate valve
1 off
7. Jaw spacer blocks 12.7 mm
4 off
8. Jaw spacer blocks 6.35 mm
4 off
9. Fast mounting plates
4 off
Summary of Contents for SILK AXL012
Page 41: ...SX012 AXL012 Flange Facing and Grooving Machine 40 Fig 17 Base clamping assembly ...
Page 49: ...SX012 AXL012 Flange Facing and Grooving Machine 48 Fig 20 Saddle ...
Page 52: ...SX012 AXL012 Flange Facing and Grooving Machine 51 Fig 21 Toolpost standard ...
Page 55: ...SX012 AXL012 Flange Facing and Grooving Machine 54 ...
Page 56: ...SX012 AXL012 Flange Facing and Grooving Machine 55 TOOLS FOR V GROOVE PLUNGE MACHINING ...
Page 60: ...SX012 AXL012 Flange Facing and Grooving Machine 59 APPENDIX C V GROOVE MEASUREMENT ...
Page 61: ...SX012 AXL012 Flange Facing and Grooving Machine 60 ...
Page 63: ...SX012 AXL012 Flange Facing and Grooving Machine 62 ...
Page 64: ...SX012 AXL012 Flange Facing and Grooving Machine 63 ...
Page 65: ...SX012 AXL012 Flange Facing and Grooving Machine 64 ...
Page 66: ...SX012 AXL012 Flange Facing and Grooving Machine 65 ...
Page 67: ...SX012 AXL012 Flange Facing and Grooving Machine 66 ...