Product Overview

The 

Twin Active 4000

 Activity Net has been designed to be used by children 

from 5 years of age and has been manufactured to exceed the European 

Playground Standard BS-EN 1176-1(2008).
The following installation instructions should be adhered to in order that 

the equipment functions in a safe manner.

Special Points of interest

Polished stainless steel mast with 

solid aluminium dome.
18mm diameter Nylon braided rope 

with steel re-enforcement.
Galvanised foundation steelwork.
Netform 'HD' aluminium rope 

connecting system.
Low Maintenance

Product TwinAct4000-R1 Produced by Tayplay Ltd

4.0m Twin Active 4000 

Installation Instructions

Rubber Safety Surface

Summary of Contents for Twin Active 4000

Page 1: ...e and has been manufactured to exceed the European Playground Standard BS EN 1176 1 2008 The following installation instructions should be adhered to in order that the equipment functions in a safe ma...

Page 2: ...ding to BS EN 1176 part 11 section 4 3 and therefore a mininum safety surface of 16095x10779 is required Installation instructions The Twin Active 4000 Activity Net is delivered in three sections Sect...

Page 3: ...Excavate Holes 3 Secure Central Corner Foundation positions for concreting Day Two 1 Concrete Steelwork Day Three 1 Final erection of Activity Net 2 Laying of rubber safety surface material The found...

Page 4: ...chor Safety anchor positioned in the hole at the rear of the box 355 50 Anchor hole positioned directly above the front of the concrete block Product TwinAct4000 R1 Produced by Tayplay Ltd Product Twi...

Page 5: ...mix Total volume required 8 512 cubic metres When Installing the four corner anchors it is extremely important to ensure the eyes of the anchor and associated safety anchors are held securely during...

Page 6: ...w the lifting of the item using only the net as support as this can cause irreparable damage to the net The mast must take the support The certified excavator operator will be able to assist in this o...

Page 7: ...the masts are vertical 4 When a 50kg weight is applied to the perimeter rope at the swivel connection this should Deflect approximately 100mm as shown below when the net is correctly tensioned Do not...

Page 8: ...avy use and or is subject to vandalism and should include the inspection of the following as a minimum General equipment and surface cleanliness 1 Equipment ground clearances are maintained 2 Foundati...