1. Net A End Fitting

2. Security Cap

3. High Tensile Bolt

4. 400 Diameter,

   1mm Plastic Washer

5. Nyloc Nut

6. Security Cap

7. Net B End Fitting

1

2

3

4

5

6

7

3) 

Repeat Steps one and two with the second half of the net. Using 

the shoulder bolts shown, to the top of the page, connect the two 

halves of the net together. All three turnbuckles should now be 

tensioned evenly until the masts are vertical.

4) 

When a 50kg weight is applied to the perimeter rope at the swivel 

connection this should Deflect approximately 100mm, as shown below, 

when the net is correctly tensioned. Do not over tighten the net.

5)

 Connect the second bow shackle on the loop of wire to the safety 

anchor.

6)

 Finally secure the corner boxes with their lids using the 

security bolts supplied.

A 50kg weight 

applied here 

will give 

approximately 

100mm 

deflection 

when the net 

is correctly 

tensioned.

Product TwinAct4000-R1 Produced by Tayplay Ltd

Product

TwinAct4000-R1

Page Seven

Summary of Contents for Twin Active 4000

Page 1: ...e and has been manufactured to exceed the European Playground Standard BS EN 1176 1 2008 The following installation instructions should be adhered to in order that the equipment functions in a safe ma...

Page 2: ...ding to BS EN 1176 part 11 section 4 3 and therefore a mininum safety surface of 16095x10779 is required Installation instructions The Twin Active 4000 Activity Net is delivered in three sections Sect...

Page 3: ...Excavate Holes 3 Secure Central Corner Foundation positions for concreting Day Two 1 Concrete Steelwork Day Three 1 Final erection of Activity Net 2 Laying of rubber safety surface material The found...

Page 4: ...chor Safety anchor positioned in the hole at the rear of the box 355 50 Anchor hole positioned directly above the front of the concrete block Product TwinAct4000 R1 Produced by Tayplay Ltd Product Twi...

Page 5: ...mix Total volume required 8 512 cubic metres When Installing the four corner anchors it is extremely important to ensure the eyes of the anchor and associated safety anchors are held securely during...

Page 6: ...w the lifting of the item using only the net as support as this can cause irreparable damage to the net The mast must take the support The certified excavator operator will be able to assist in this o...

Page 7: ...the masts are vertical 4 When a 50kg weight is applied to the perimeter rope at the swivel connection this should Deflect approximately 100mm as shown below when the net is correctly tensioned Do not...

Page 8: ...avy use and or is subject to vandalism and should include the inspection of the following as a minimum General equipment and surface cleanliness 1 Equipment ground clearances are maintained 2 Foundati...

Reviews: