Datum Peg to 

Top Hole 

Corner Anchor

Shuttering, Pegged and 

Nailed Timber Frame 

support anchor and corner 

box during concreting 

Product TwinAct4000-R1 Produced by Tayplay Ltd

Excavation & Foundation 

Positioning

Procedure

In loose ground, it may be 

necessary to use timber 

framework (or shuttering) to 

prevent soil falling into the 

hole.  It will also prevent an 

unnecessary excess volume of 

concrete being used.
Concrete to be in 30/N mm2 mix.  

Total volume required: 8.512 

cubic metres.

When Installing the four corner 

anchors, it is extremely 

important to ensure the eyes of 

the anchor, and associated 

safety anchors, are held 

securely during concreting to 

minimise any movement.
Install the centre foundation 

spigot.  Use bolted temporary 

timber supports to suspend and 

secure the anchor during 

concreting.

Note:

To easily remove the support 

timbers following concreting, 

secure the timbers by bolting 

from the underside of the 

spigots top plate.

Corner Before Concreting

Centre Before Concreting

Centre After Concreting

Product

TwinAct4000-R1

Page Five

Corner After Concreting

Summary of Contents for Twin Active 4000

Page 1: ...e and has been manufactured to exceed the European Playground Standard BS EN 1176 1 2008 The following installation instructions should be adhered to in order that the equipment functions in a safe ma...

Page 2: ...ding to BS EN 1176 part 11 section 4 3 and therefore a mininum safety surface of 16095x10779 is required Installation instructions The Twin Active 4000 Activity Net is delivered in three sections Sect...

Page 3: ...Excavate Holes 3 Secure Central Corner Foundation positions for concreting Day Two 1 Concrete Steelwork Day Three 1 Final erection of Activity Net 2 Laying of rubber safety surface material The found...

Page 4: ...chor Safety anchor positioned in the hole at the rear of the box 355 50 Anchor hole positioned directly above the front of the concrete block Product TwinAct4000 R1 Produced by Tayplay Ltd Product Twi...

Page 5: ...mix Total volume required 8 512 cubic metres When Installing the four corner anchors it is extremely important to ensure the eyes of the anchor and associated safety anchors are held securely during...

Page 6: ...w the lifting of the item using only the net as support as this can cause irreparable damage to the net The mast must take the support The certified excavator operator will be able to assist in this o...

Page 7: ...the masts are vertical 4 When a 50kg weight is applied to the perimeter rope at the swivel connection this should Deflect approximately 100mm as shown below when the net is correctly tensioned Do not...

Page 8: ...avy use and or is subject to vandalism and should include the inspection of the following as a minimum General equipment and surface cleanliness 1 Equipment ground clearances are maintained 2 Foundati...

Reviews: