![Tayplay Twin Active 4000 Installation Instructions Manual Download Page 5](http://html1.mh-extra.com/html/tayplay/twin-active-4000/twin-active-4000_installation-instructions-manual_3770633005.webp)
Datum Peg to
Top Hole
Corner Anchor
Shuttering, Pegged and
Nailed Timber Frame
support anchor and corner
box during concreting
Product TwinAct4000-R1 Produced by Tayplay Ltd
Excavation & Foundation
Positioning
Procedure
In loose ground, it may be
necessary to use timber
framework (or shuttering) to
prevent soil falling into the
hole. It will also prevent an
unnecessary excess volume of
concrete being used.
Concrete to be in 30/N mm2 mix.
Total volume required: 8.512
cubic metres.
When Installing the four corner
anchors, it is extremely
important to ensure the eyes of
the anchor, and associated
safety anchors, are held
securely during concreting to
minimise any movement.
Install the centre foundation
spigot. Use bolted temporary
timber supports to suspend and
secure the anchor during
concreting.
Note:
To easily remove the support
timbers following concreting,
secure the timbers by bolting
from the underside of the
spigots top plate.
Corner Before Concreting
Centre Before Concreting
Centre After Concreting
Product
TwinAct4000-R1
Page Five
Corner After Concreting