23
THE REPAIR
No.
Process
Notice
Assemble 2
5
6
7
8
Assemble the fastening nut
Assemble the Belt
Assemble the protector
Final checking
- Use fixing jig and 17mm
socket wrench
as if disassembling,
as fastening torque about
100~200kgf-cm.
- Check the end-play, up and
downward and check the bind-
ing force, too much or not on
bi-direct of rotation.
Finally, check the interferance
depth both clutch tip and clutch
boss(3.5~4.5mm)
Clutch Tip
3.5~4.5
Synchronous
Motor
Drain
Valve
Summary of Contents for TAW-A70FD
Page 31: ...APPENDIX 30 WIRING DIAGRAM Wiring Diagram ...
Page 32: ...31 PARTS DIAGRAM Parts Diagram ...
Page 34: ...33 PARTS DIAGRAM ...
Page 36: ...35 PARTS DIAGRAM ...
Page 38: ...37 PARTS DIAGRAM ...
Page 40: ...39 CIRCUIT DIAGRAM Circuit Diagram ...
Page 41: ...S M NO ...