121
GAPCR-HD 8013/GASPCR-HD 9017/GASPCR-EHD 10020 - Rev. 05 - Sep/22
Average income tables
10. Important data
Model
Model
Number of
Number of
disc blades
disc blades
Cutting
Cutting
width (m)
width (m)
Hourly income
Hourly income
(ha)
(ha)
Daily income (ha)
Daily income (ha)
GASPCR
EHD
10020
12
2.88
2.88
1.55
13.95
14
3.35
1.81
16.29
16
3.81
2.06
18.54
18
4.28
2.31
20.79
20
4.75
2.56
23.04
22
5.23
2.82
25.38
24
5.70
3.08
27.72
26
6.32
3.41
30.69
28
6.77
3.66
32.94
30
7.25
3.91
35.19
NOTE
- An average speed of 6 km/h was assumed to prepare the table above.
To know how many hours will be spent to work a certain previously known area, it is
necessary to divide the value of the area by the hourly income.
Example: An area of 50 hectares to be worked with a GASPCR-HD 9017 that has 22
disc blades (hourly income = 2.49 hectares).
So: 50 = 20.08
2.49
Approximately will be spent 20 (twenty) hours to work in an area of 50 hectares.