
Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 7
2.0
Product Description and Requirements for Safe Operation
2.1 Boiler Overview
2.1.1 Boiler Cut-away
Product Description and Requirements for Safe Operation > Boiler Overview
8
1
2
4
5
6
7
1. Control Panel
2. Loading Door
3. Fire Chamber
4. Primary Air Adjustment
5. Secondary Air Adjustment
6. Ash Door
7. Sight Glass
8. Gasification Tunnel
9. Secondary Air Injection
10. Heat Exchanger Tubes and Flue Gas Turbulators
11. Cleanout
12. Primary Air Injection
13. Flue Collar
14. Induced Draft Fan
15. Cleanout Cover
3
9
10
12
11
14
15
13
Fig 2.0