
Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 50
8.0 Installation Report for Boiler System
Installation Performed by:_________________________________________
Bonus Plus Model / Serial No. ____________________/_________________
Boiler System Installed and Adjusted: ________________________________
Date
Warranty Certificate Filled and Sent: _________________________________
Date
Measured and Adjusted Values
Date
Date
Date
Date
Fuel Type
Fuel Moisture Content
Secondary Air Setting
Primary Air Setting
Pump Speed (C-3)
Other Data/Adjustments
Setting Done By:
Signature
Installation Report for Boiler System > Installation Report for Boiler System