3.4.3 System Plumbing
There are numerous possibilities for connecting your Bonus Plus and thermal storage system to your
home heating system. Tarm Biomass provides diagrams as concept diagrams only. Final design, in-
stallation, and code compliance details are the responsibility of the designer/installer of the system.
3.4.4 Pipe Connections – Choice of Material
Copper or black iron pipe may be used. Do not use galvanized iron pipe. The supply and return flows
must be carefully insulated to avoid heat loss.
3.4.5 Immersion Tubes and Wells
Remember to install the immersion tubes provided in the corresponding well.
Remember to plug
wells which are not used in the chosen form of installation.
3.4.6 Expansion Tank
The size of the expansion tank is determined by the total water content of the heating system.
3.4.7 Pump Size
The size of the circulation pump is determined by the size of the system and the pipe dimensions.
3.4.8 Installing the Circulator Aquastat
The Honeywell L6006A aquastat provided is installed to activate the boiler’s circulator in case there is
a temperature rise after the boiler has shutdown.
Boiler Installation & Start-up > Connections to the Boiler
NOTE
Any radiant tubing used with the Solo Plus boiler must have an oxygen barrier! Non oxygen
barrier tubing must be separated from the boiler using a heat exchanger.
NOTE
The Normal Operating pressure is between 12-15psi.
First, remove the boiler’s top panel.
Next, remove the side panel (can be left
or right) Remove the ½” fitting (Shown
in image).
Install the new ½” sensor well.