![Target Auger Manager User Manual Download Page 22](http://html1.mh-extra.com/html/target/auger-manager/auger-manager_user-manual_3602949022.webp)
22
TARGET AUGER MANAGEMENT SYSTEM
TARGET AUGER MANAGEMENT SYSTEM rev.04
6.2.3.1 Maximum Run Time Curve
You can define a curve to get an automatic adjustment of the
maximum run time over time.
A curve is defined using up to eight points. Each point specifies a
day number and a run time alarm limit for that day. The controller
will change the alarm limit every day in a linear fashion between
consecutive points of the curve. When the last point of the curve
is reached, the maximum run time for that day is maintained until
a new batch starts. The highest possible day number is 450.
NOTES:
All points of the curve must be specified. If eight points are not
needed, repeat the last max run time value for each unnecessary
point or decrease the day number: if the day number is decreased,
the curve remains at the previous point and ignores all following
points.
GRAPHIC:
Max Run Time Curve
MAX RUN
TIME
(h:m)
DAYS
D1
D10
D15
4:00
D20
D25
D30
D35
D40
1:00
1:30
2:00
2:30
3:00
3:30
D45
22
TA
RG
ET
G
ES
TIO
N D
E V
IS
TAR
GET
G
ESTIO
N D
E VI
S
rev.
04
6.2
.3
.1
Cou
rbe
d
u te
mp
s d
e m
arc
he
m
ax
im
um
Une
c
ourbe
pe
ut ê
tre
dé
fini
e a
fin
de r
égl
er
aut
oma
tique
me
nt l
e
te
mps
d
e m
arc
he
m
ax
im
um
de
s v
is
au
fil
de
s j
ours
.
Ch
aq
ue c
our
be c
omp
orte
hui
t p
oint
s e
t pos
sè
de 2
ty
pe de
do
n-
né
es
: u
n n
um
éro
d
e jo
ur
et
le
te
mp
s d
e m
arc
he
m
ax
im
um
d
e la
vi
s
pour
ce
jo
ur.
Le
co
ntrô
le
ur pe
ut a
in
si
ajus
te
r l
a l
im
ite
d
'a
la
rm
e du
te
mp
s de
m
arc
he
m
ax
im
um
d
e f
aç
on
liné
air
e e
ntre
le
s p
oint
s c
on
-
sé
cut
ifs
de
la
c
ourbe
. L
ors
que l
e de
rni
er
point
de
la
c
ourbe
e
st
att
eint
, l
e t
em
ps de
m
arc
he
p
our c
e j
our
es
t m
aint
enu
ju
squ
’à
ce
qu
'u
n no
uv
el é
le
va
ge
d
éb
ute
.
NO
TE
S:
Le
s h
uit
poin
ts
d
e l
a c
our
be d
oiv
ent
o
blig
ato
ire
me
nt
êtr
e e
nre
gis
-
tré
s.
Si
hui
t p
oin
ts
n
e s
ont
pa
s r
equ
is
, r
ép
éte
z le
d
ern
ie
r t
em
ps
d
e
ma
rc
he m
ax
im
um s
ur l
es
p
oint
s i
nuti
lis
és
ou
di
minue
z l
e nu
mé
ro
du jour
. C
ett
e di
minut
ion
ent
ra
îne
l'
arr
êt
de l
a pr
ogre
ss
ion
de l
a
co
urb
e.
GR
AP
HIQ
UE
:
Co
urb
e
du
t
em
ps
d
e
ma
rc
he
m
ax
im
um
TE
MP
S
DE
M
AR
CH
E
MA
X
(h
:m
)
JO
UR
S
J1
J10
J15
4:00
J20
J25
J30
J35
J40
1:00
1:30
2:00
2:30
3:00
3:30
J45
Summary of Contents for Auger Manager
Page 36: ...NOTES NOTES NOTES NOTES...