5-47
MAINTENANCE
Installation
WHEN REQUIRED
1. Align the pin hole (A) on the bucket with
the pin hole on the arm (5), and install the
pin (2).
2. Operate the cylinder, align the pin hole (B)
on the bucket with the pin hole on the link
arm (6), and install the pin (2).
3. Align the turn prevention holes, install the
lock pin (1), and then engage the ring
inside.
AD6G034
1
Summary of Contents for TB210R
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 SAFETY...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS...
Page 48: ...1 38...
Page 49: ...2 1 CONTROLS...
Page 71: ...3 1 OPERATION...
Page 101: ...4 1 TRANSPORT...
Page 106: ...4 6...
Page 107: ...5 1 MAINTENANCE...
Page 159: ...6 1 TROUBLESHOOTING...
Page 175: ...7 1 SPECIFICATIONS...
Page 177: ...7 3 MEMO...
Page 178: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 180: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS Limited boom swing angle type...
Page 182: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 184: ...7 10 MEMO...
Page 186: ...7 12 SPECIFICATIONS LIFTING CAPACITIES...
Page 187: ...7 13 SPECIFICATIONS LIFTING CAPACITIES...
Page 188: ...7 14...
Page 189: ...8 1 OPTIONS...
Page 203: ...8 15...