4-4
TRANSPORT
HOISTING THE MACHINE
• Know and use the correct crane signals.
• Check the hoisting equipment for
damaged or missing parts on a daily
basis and replace as necessary.
• When hoisting, use a wire rope capable
of lifting the machine mass.
• Hoist the machine in only as manner
described in the procedure below. Do
not do it in any other manner. Doing so
is dangerous as it may result in the
machine losing its balance.
• Do not hoist the machine with an
operator on it.
• When hoisting, hoist slowly so that the
machine does not tip.
• Keep everyone out of the area when
hoisting. Do not move the machine over
the heads of the persons.
IMPORTANT: This hoisting method
applies to machines with standard
specifications. The center of gravity
differs according to the attachments and
optional equipment installed.
Contact your Takeuchi service agent for
details.
HOISTING THE MACHINE
Hoisting
1. Slew the upperstructure so that the dozer
blade is at the rear of the machine (set the
upperstructure parallel to the track frame).
2. Lock the slewing operation.
3. Raise the dozer blade fully.
4. Extend the bucket cylinder and arm
cylinder fully to raise the boom to its
uppermost position.
5. If the boom is swung to either the left or
right side, set it in the neutral position.
6. Raise the safety lock lever to the locked
position.
7. Stop the engine, remove the starter key
and get off the machine.
8. Install the wire ropes as shown on the
figure below.
9. Hoist the machine slowly until it leaves the
ground.
10. Stop hoisting until the machine becomes
stable, and then start hoisting the
machine slowly again.
Summary of Contents for TB210R
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 SAFETY...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS...
Page 48: ...1 38...
Page 49: ...2 1 CONTROLS...
Page 71: ...3 1 OPERATION...
Page 101: ...4 1 TRANSPORT...
Page 106: ...4 6...
Page 107: ...5 1 MAINTENANCE...
Page 159: ...6 1 TROUBLESHOOTING...
Page 175: ...7 1 SPECIFICATIONS...
Page 177: ...7 3 MEMO...
Page 178: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 180: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS Limited boom swing angle type...
Page 182: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 184: ...7 10 MEMO...
Page 186: ...7 12 SPECIFICATIONS LIFTING CAPACITIES...
Page 187: ...7 13 SPECIFICATIONS LIFTING CAPACITIES...
Page 188: ...7 14...
Page 189: ...8 1 OPTIONS...
Page 203: ...8 15...