5-35
MAINTENANCE
EVERY 250 HOURS
7. Clean the primary element (3) with dried
compressed air (294 to 490 kPa or 43 to
71 psi).
First blow the air from the inside of the
element along the pleats. Then blow the
air from the outside and finally from the
inside again.
8. Light up the inside of the primary element
(3) with a light bulb, inspect it, and replace
it if there are small holes or thin spots.
9. Remove the cloth or tape applied in step
5.
10. Install the primary element (3).
11. Install the dust cup (2) with its
“ TOP ” mark facing up, and then
fasten it with the clamps (1).
Summary of Contents for TB210R
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 SAFETY...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS...
Page 48: ...1 38...
Page 49: ...2 1 CONTROLS...
Page 71: ...3 1 OPERATION...
Page 101: ...4 1 TRANSPORT...
Page 106: ...4 6...
Page 107: ...5 1 MAINTENANCE...
Page 159: ...6 1 TROUBLESHOOTING...
Page 175: ...7 1 SPECIFICATIONS...
Page 177: ...7 3 MEMO...
Page 178: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 180: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS Limited boom swing angle type...
Page 182: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 184: ...7 10 MEMO...
Page 186: ...7 12 SPECIFICATIONS LIFTING CAPACITIES...
Page 187: ...7 13 SPECIFICATIONS LIFTING CAPACITIES...
Page 188: ...7 14...
Page 189: ...8 1 OPTIONS...
Page 203: ...8 15...