132
MAINTENANCE
When Required
3. Operate the cylinder, line up pin hole (B)
in the bucket with the pin hole in the link
arm (6), and install the pin (2).
4. Line up the turn prevention holes, install
the bolt (1), and the nuts.
Be sure to leave a gap of about 0.5 ~ 1 mm
(0.02 ~ 0.04 in.) between the nut and bucket
bush, or the nut will come loose.
5. Slide the O-ring (4).
E4G055
0.5~1mm
1
E4G056
4
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the diagram above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
E4G057
3
Summary of Contents for AF4E001
Page 6: ...4...
Page 8: ...6...
Page 36: ...34...
Page 91: ...89 TRANSPORT Loading and Unloading 90 Securing the Machine 91 Cautions on Transporting 92...
Page 153: ...151 MEMO...
Page 154: ...152 SPECIFICATIONS Machine Dimensions J1K001 N L M D Q P J H K C F G A S E B R T U...
Page 156: ...154 SPECIFICATIONS Operating Range J1K002 D J H K C F G A E B...
Page 158: ...156 MEMO...
Page 162: ...160...
Page 167: ...165 OPTIONS Safety Signs Decals 1 No 03593 32200 2 No 03593 32300...
Page 168: ...166 MEMO...
Page 173: ...171 MEMO...
Page 174: ...172...
Page 175: ...173 INDEX...