82
OPERATION
Operating Procedures
Operations Possible with this Machine
Excavating
1. Set the dozer blade on the side opposite
the side you want to dig on and dig it slightly
into the ground.
2. Use the arm and bucket and dig with
shallow, long strokes. The digging force
is strongest when the boom and arm angle
is 80 to 120
°
. Use this angle for effective
digging.
Digging Ditches
Mount a bucket suited for digging ditches and
set the crawlers parallel to the ditch to be
dug for greater efficiency.
When digging wide ditches, dig the sides first,
the center later.
Digging Side Ditches
Use the boom swing function to dig side
ditches as shown in the diagram.
Loading
When loading dirt in a truck, starting from
the back of the truck’s bed makes for easier
loading and increases the amount of dirt that
can be loaded.
Also, use a small slewing angle for greater
efficiency.
E4D050
80°〜120°
E4D051
E4D052
60
°
75
°
Summary of Contents for AF4E001
Page 6: ...4...
Page 8: ...6...
Page 36: ...34...
Page 91: ...89 TRANSPORT Loading and Unloading 90 Securing the Machine 91 Cautions on Transporting 92...
Page 153: ...151 MEMO...
Page 154: ...152 SPECIFICATIONS Machine Dimensions J1K001 N L M D Q P J H K C F G A S E B R T U...
Page 156: ...154 SPECIFICATIONS Operating Range J1K002 D J H K C F G A E B...
Page 158: ...156 MEMO...
Page 162: ...160...
Page 167: ...165 OPTIONS Safety Signs Decals 1 No 03593 32200 2 No 03593 32300...
Page 168: ...166 MEMO...
Page 173: ...171 MEMO...
Page 174: ...172...
Page 175: ...173 INDEX...