74
OPERATION
Machine Operation
Operating the Boom Offset
a
To offset left:
Press the left side of the pedal.
e
To offset right:
Press the right side of the pedal.
Operating the Dozer Blade
a
To lower the dozer blade:
Tilt the lever forward.
e
To raise the dozer blade:
Tilt the lever backward.
Operating the Arm
a
To contract the arm:
Tilt the left operating lever backward.
e
To extend the arm:
Tilt the left operating lever forward.
Operating the Bucket
a
To dig:
Tilt the right operating lever to the left.
e
To dump:
Tilt the right operating lever to the right.
E4D023
E4D024
E4D026
L2D0061
Summary of Contents for AF4E001
Page 6: ...4...
Page 8: ...6...
Page 36: ...34...
Page 91: ...89 TRANSPORT Loading and Unloading 90 Securing the Machine 91 Cautions on Transporting 92...
Page 153: ...151 MEMO...
Page 154: ...152 SPECIFICATIONS Machine Dimensions J1K001 N L M D Q P J H K C F G A S E B R T U...
Page 156: ...154 SPECIFICATIONS Operating Range J1K002 D J H K C F G A E B...
Page 158: ...156 MEMO...
Page 162: ...160...
Page 167: ...165 OPTIONS Safety Signs Decals 1 No 03593 32200 2 No 03593 32300...
Page 168: ...166 MEMO...
Page 173: ...171 MEMO...
Page 174: ...172...
Page 175: ...173 INDEX...