
2-8
CONTROLS
FRONT WINDOW
• Grasp the handles firmly with both
hands when opening and closing the
front window. Your head or hands may
get caught if it slips from your hands.
• When the front window is opened or
closed, it will come close to the head.
Be careful that the window does not
strike the head.
• When you open the front window, be
sure to lock it in place with the lock pins
on the left and right sides. The window
may fall if it is not locked in place.
Opening
CAB
1. Park on a level surface and stop the engine.
2. Set the safety lock lever to the locked
position.
3. Grasp the left and right handles (1) and
press the knobs (2) with your thumb to
release the lock.
4. Pull the front window (3) toward you and
lift while doing so.
5. Release your thumb from the knobs (2)
and then lift the front window (3) fully and
lock the front window with lock pin (4).
Closing
When closing the front window slowly so
as not to hit your head. Lowering the
window abruptly may result injury or
damage the front window.
1. Grasp the left and right handles (1) and
press the knobs (2) with your thumb to
release the lock.
2. Pull down the front window (3) and while
doing so, slide it to the front and slowly
lower it.
3. Release your thumb from the knobs (2)
and then press the front window toward
front and lock the front window with lock
pin (4).
AG7B014
2
1
2
1
3
4
AG7B015
2
3
2
AG7B016
3
2
1
2
1
4
AG7B017
3
2
2
Summary of Contents for 190100003
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 77: ...2 25 MEMO...
Page 126: ...2 74...
Page 127: ...3 1 OPERATION...
Page 155: ...3 29 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 217: ...5 51 MEMO...
Page 229: ...5 63 MEMO...
Page 235: ...5 69 MEMO...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 255: ...6 9 MEMO...
Page 271: ...7 1 SPECIFICATIONS...
Page 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 280: ...7 10 MEMO...
Page 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 286: ...7 16...
Page 287: ...8 1 OPTIONS...
Page 303: ...8 17...