5-71
MAINTENANCE
Installation
1. Remove the dirt on the surface of adaptor
and the inner part of tooth, make the
better contact on the mating part.
2. Push rubber pin lock (3) into the welding
adaptor (4).
Do not let the rubber pin lock stick out
from the welding adaptor surface.
WHEN REQUIRED
3. Install the point (2) onto the welding
adaptor (4).
Insert the point so that the surface behind
the point’s pin hole is aligned with the
surface behind the welding adapter’s pin
hole.
4. Knock out the locking pin (1).
Check that the end surfaces of the locking
pin just knocked out are aligned with the
upper and lower surface of the point. Do
not use the worn locking pin.
The life of the teeth can be lengthened
and the frequency of its replacement can
be reduced by turning it upside down so
that it will wear evenly.
Replace the rubber pin lock and locking
pin at the same time as replacing the
teeth. This makes it possible to prevent
the teeth from falling out
• Side cutter
Installation
1. Insert the bolts from the inner of the
bucket and tighten the side cutter with
nuts.
Tightening torque: 475 N·m (350 ft-lb.)
2. Caulk the bolts with a punch at three
spots along the periphery of the screw to
prevent the nuts from coming loose.
Summary of Contents for 190100003
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 77: ...2 25 MEMO...
Page 126: ...2 74...
Page 127: ...3 1 OPERATION...
Page 155: ...3 29 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 217: ...5 51 MEMO...
Page 229: ...5 63 MEMO...
Page 235: ...5 69 MEMO...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 255: ...6 9 MEMO...
Page 271: ...7 1 SPECIFICATIONS...
Page 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 280: ...7 10 MEMO...
Page 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 286: ...7 16...
Page 287: ...8 1 OPTIONS...
Page 303: ...8 17...