
1-27
SAFETY
Hoist the machine safely
• Know and use correct crane signals.
• Check the hoisting equipment for damaged
or missing parts on a daily basis and
replace as necessary.
• When hoisting, use a wire rope capable of
lifting the machine mass.
• Hoist the machine in such a manner
described in the procedure below. Do not
do it in any other manner, as it may result in
the machine losing its balance.
Refer to “Hoisting the machine” for further
instructions.
• Do not hoist the machine with an operator
on it.
• When hoisting, hoist slowly so that the
machine does not tip.
• Keep everyone out of the area when
hoisting. Do not move the machine over
the heads of the persons.
PRECAUTIONS WHEN TRANSPORTING
Transport the machine safely
• Know and follow the applicable safety
rules, vehicle code and traffic laws when
transporting the machine.
• Select the best transport route by
considering the length, width, height and
weight of the truck with the machine
loaded on it.
• Never abruptly start or stop or run at a high
speed at the sharp curves during transport.
Doing so will move or lose the balance of
the loaded machine.
Summary of Contents for 190100003
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 77: ...2 25 MEMO...
Page 126: ...2 74...
Page 127: ...3 1 OPERATION...
Page 155: ...3 29 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 217: ...5 51 MEMO...
Page 229: ...5 63 MEMO...
Page 235: ...5 69 MEMO...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 255: ...6 9 MEMO...
Page 271: ...7 1 SPECIFICATIONS...
Page 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 280: ...7 10 MEMO...
Page 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 286: ...7 16...
Page 287: ...8 1 OPTIONS...
Page 303: ...8 17...