Preparation for Operation
TB7100 Installation and Operation Manual
© Tait Electronics Limited
December 2005
Note
By default the audio frequency response will be flat.
7.4.4
Applying Power
Before turning on the base station, check that:
■
all looms and cables at the front and rear of the base station are fitted
correctly
■
all connectors are secure
■
the 20 A fuse is fitted.
Turn on the power supply and check that the base station powers up
correctly:
■
The power LED on the user interface lights up.
■
The LCD indicates the current channel number.
7.4.5
Programming
No changes to the values programmed for line-controlled base operation are
required. See
“Programming” on page 82
for details.
Note
If a soft tail setting is required see later in this chapter
“Soft Off
(Tx Tail Time)” on page 118
.
Figure 7.4
System interface link positions
J400
J500
J502
J503
J501
Summary of Contents for TB7100
Page 1: ...TB7100 base station Installation and Operation Manual MBB 00001 02 Issue 2 December 2005...
Page 10: ...10 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 76: ...76 Connections TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Page 142: ...142 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...